Licensed lead · not independently verified · dcd-dir-000603

ETC DC OpCo Lysite Data Center ("1 MW DC Site")

source-reported proposed

ETC DC OpCo LLC

Lysite · Fremont County · Wyoming

Capacity not statedSource updated 14 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for ETC DC OpCo Lysite Data Center ("1 MW DC Site").

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
ETC DC OpCo LLC
Address and locality
Lysite · Fremont County · Wyoming
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000603

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Announced
15 July 2026Provider-reported announcement date.

Provider notes

Energy. Permit application covers eight Mesa Power Solutions GV22 PowerCore natural-gas-fired emergency generator engines rated 604 horsepower each (4,832 hp total), each limited to 100 hours of non-emergency operation per year with non-resettable hour meters, which WDEQ treats as best available control technology.

What the source record says

Site is about three miles east-northeast of Lysite in unincorporated eastern Fremont County, near the Lost Cabin Gas Plant. The application documents label the project the "1 MW DC Site"; the DEQ analysis does not explain whether that designation is the anticipated electrical demand or another measure, so no capacity is recorded here. Footprint, acreage and water use are not disclosed in available records. Coordinates are a geocode from the published distance-and-bearing description and are not a parcel-confirmed point.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-08-19 · source-reported proposed

    WDEQ Air Quality Division issued a proposed approval of the 2026-07-15 permit application; public comment open through 2026-09-14. Fremont County has no countywide zoning, so no county land-use permit is required.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID etc-dc-opco-lysite-fremont-county-wy. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000603

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Lysite, WY · Fremont (Approximate location)

Roles

  • Operator: ETC DC OpCo LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 15 July 2026

    Provider-reported announcement date.

  • Status history: 2026-08-19 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →