Facts at a glance
- Record ID
related-digital-cheyenne-wy- Record type
- campus
- Developer
- Related Digital
- Operator
- Not named in the cited records
- Owner
- Owner of record not established
- Tenant
- CoreWeave
- Capacity
- up to 302 MW critical it · campus scope
The source expressly labels this as up to 302 MW of IT capacity for the planned campus. It is a construction-stage design scope, not current energized IT load, measured load, generation or approved utility service. - Location
- Cheyenne, WY
approximate — The Wyoming Business Council catalog places the campus in Cheyenne Business Parkway. It does not provide a street address, parcel, county or coordinates. - Physical scale
- Physical scale: A planned 115-acre campus; the first planned facility is 184,000 square feet. These are planned construction-stage dimensions, not completed floor area or a total building count.
What the sources support
The Wyoming Business Council's May 2026 program catalog says Related Digital is currently under construction in Cheyenne and was certified in 2025 for the Data Center Sales Tax Exemption. The expected late-2026 completion of the first facility is a forecast, not evidence of completion or operation.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address
- parcel
- county site locator
- coordinates
- land or building owner
- operator
- utility request or approved service capacity
- current or measured IT load
- total building count
- work-start date
- completion or opening evidence
Sources
-
Wyoming Business Council Programs & Service Catalog — May 2026 →Gov. record
Exact location Data Center Sales Tax Exemption Eligibility Certification; Recipient Reports & Related Resources; PDF/printed page 9; Related Digital paragraph
What it supports Campus identity, Related Digital developer role, Cheyenne Business Parkway location, construction status, 2025 incentive certification, 115-acre planned campus, up-to-302-MW IT-capacity scope, first 184,000-square-foot planned facility, forecast completion and CoreWeave anchor-tenant role.
Record history
DataCenterData record added · 13 September 2026 · DataCenterData review
related-digital-cheyenne-wy → Publication
Why Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Also listed as dcd-dir-001255 in the licensed third-party directory; that directory row is not independently verified.
Suggest a correction → Record ID related-digital-cheyenne-wy and the page are prefilled. Accepted material corrections appear on Changes.