Minnesota index · last changed 1 November 2026

Minnesota data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Minnesota data centers.

7 sourced policy records for Minnesota ↓Facility register: 81 records · by county →1 published DataCenterData record · evidence status shown per row37 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Minnesota

Map, listings and checked facts.

Start with 37 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Minnesota map

Reported locations in Minnesota

37 licensed rows · 23 source localities · 4 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 65 data-center source listings here across licensed, operator and DataCenterData layers (39 with a map point); 109 with government registry records. Source listings are not distinct sites.2 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 4 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

37 licensed rows23 reported city labels28 eligible organization labels

Browse all 37 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported permittedReported planned 10 MWSource updated 13 October 2026approximate location
  2. source-reported cancelledCapacity not statedSource updated 25 July 2026exact location (provider label)

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

8 operator-listed sites (mixed units; not added to licensed rows) in Minnesota →

6 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Minnesota evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
37 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 12 September 2026 · next 15 December 2026
Known coverage gap

No Minnesota certification list, programme report or incentive award document was obtained, so no Minnesota research lead carries an incentive record.

Browse all 37 Minnesota licensed leads → · Why these counts differ →

Campuses

1 campus record. Names are as they appear on each record page.

Campuses published for Minnesota
Record / rolesStatusCapacity / scalePrimary evidence
Meta Rosemount Data Center constructioncampus · current City of Rosemount FAQ, corroborated by city and public-university records UnknownNo independently supported figureNo selected publication source states critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW. City of Rosemount FAQ — Public Works / Water Quality →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 12 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 15 December 2026.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

  • Economic development incentives — Partly checked
    • No Minnesota certification list, programme report or incentive award document was obtained, so no Minnesota research lead carries an incentive record.
    • The bot wall was not bypassed, by rule; all three mn.gov attempts are recorded as failures.
    • The 2025 statutory changes to the Minnesota exemption, which the Illinois report describes as adding green certifications, increasing water permitting and terminating the electricity exemption, were not checked against a Minnesota source.

    Selected records

  • Utility commission and large-load records — Partly checked
    • No Minnesota docket document was read, so no docket number, electric service agreement or large-load tariff appears in the current research record.
    • No Minnesota research lead carries a utility request megawatt figure.
    • Great River Energy, Dakota Electric and municipal utility filings were not searched.

    Selected records

  • Environmental and construction permits — Partly checked
    • The air permit applications dashboard is a Tableau view and was not queried, so no Minnesota air permit application number was obtained.
    • No water appropriation permit, NPDES permit or wetland permit was searched, even though the dataset records Minnesota water-permitting changes for data centres.
    • No Minnesota generator fleet is documented anywhere in the current research record.

    Selected records

  • Local planning, assessor and map records — Partly checked
    • Six of the seven Minnesota municipalities with active data centre cases were unreachable, so the plat, planned unit development, development contract, rezoning and denial records behind five Minnesota lifecycle statuses were never read.
    • No Minnesota county assessor or GIS portal was queried; no parcel identifier appears anywhere in the current research record.
    • The Glencoe rezoning the dataset dates to 6 November 2025 falls between the two council meetings the city's index lists, and could not be located.

    Selected records

  • Tax abatements and development agreements — Partly checked
    • No Minnesota development agreement, tax abatement, tax increment financing instrument or certification was retrieved.
    • Whether the Farmington development contract remains in force after the litigation the dataset mentions is unknown.
  • Operator disclosures — Partly checked
    • No colocation operator page was opened for Minnesota, so the DataBank, Centersquare, Flexential, LightEdge, CENTRA, H5, Lumen, Vaultas and AAIM records rest on the dataset alone.
    • Google, Microsoft, Amazon Web Services and Tract location pages were not yet reviewed directly for Minnesota.
    • the current review did not include a broad discovery sweep for Minnesota, so operator pages could only be reached by guessing URLs or by following links already held.

    Selected records

  • Open datasets and directories — Checked
    • No unlicensed directory was consulted, so no independent count of Minnesota colocation facilities was attempted.
    • Because almost nothing else was reachable, 25 of the 26 Minnesota research leads cite only this one dataset, which is a single point of failure for the statewide review.

    Selected records

  • Closures, withdrawals and former names — Partly checked
    • Every one of these reversals rests on the dataset; no Minnesota city denial, withdrawal letter or council minute was retrieved to confirm any of them.
    • The dataset records that Google abandoned a $600 million Becker project in 2022 but holds no record for it, so that closure is noted and not carried as a research lead.
    • No closed or demolished Minnesota data centre was searched for.

    Selected records

  • News and other discovery — Partly checked
    • the current review did not include a broad discovery sweep before Minnesota, so no keyword news sweep of Minnesota was possible and the Star Tribune, Sun Thisweek and other local coverage the dataset cites was not read.

    Selected records

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Alexandria, Apple Valley, Becker, Brooklyn Park, Cannon Falls, Chaska, Duluth, Eagan, Eden Prairie, Minneapolis, Monticello. Their listings above are source listings to investigate. No statewide evidence answer is published for Minnesota either; statewide rules are under Policy tracker below.

1 Minnesota answer is not tied to a published record, so it is not placed here: Minnesota answers.

Policy tracker

Minnesota policy records

7 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 6 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Reporting or resource-use requirement

Water-use permit conditions for large data centers

In effect · Minnesota · State

Effective: 15 June 2025

Issuing authority: Minnesota Legislature

Minnesota Statutes section 103G.271, subdivision 5b, added by the 2025 data center act, sets conditions for new or modified water-use permits for data centers whose proposed new or additional consumptive use exceeds 100,000,000 gallons per year, and for existing permits that will supply more than 100,000,000 gallons per year to a data center.

Read the sourced record · Primary source

Enacted legislation or regulation

Annual fee on qualified large-scale data centers

In effect · Minnesota · State

Effective: 15 June 2025

Issuing authority: Minnesota Legislature

Minnesota Statutes section 216B.72, added by the 2025 data center act, requires an annual fee from each qualified large-scale data center, tiered by the peak demand its utility arranges to serve: $2 million for 100 to 250 MW, $3 million above 250 MW but below 500 MW, $4 million for 500 MW but below 750 MW, and $5 million for 750 MW or more.

Read the sourced record · Primary source

Incentive or explicitly supportive policy

Qualified data center sales-tax exemption

In effect · Minnesota · State

Last checked: 23 September 2026

Issuing authority: Minnesota Legislature

Minnesota Statutes 2025, section 297A.68, subdivision 42, exempts specified enterprise information technology equipment and computer software used in a qualified data center, a qualified refurbished data center, or a qualified large-scale data center.

Read the sourced record · Primary source

Pending or nonbinding 1 record

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Reporting or resource-use requirement

Environmental Quality Board guidance on environmental review for data centers (FAQ)

Informational—not binding · Minnesota · State

Last checked: 23 September 2026

Issuing authority: Minnesota Environmental Quality Board

Minnesota's Environmental Quality Board publishes a data center FAQ explaining when large or hyperscale data center projects must go through state environmental review under the existing rules, which project features (on-site power generation, energy storage, water appropriation, wastewater, air emissions, land conversion) tend to trigger mandatory review, and how projects covered by an area-wide review are handled.

Read the sourced record · Primary source

Federal and multistate

Federal and multistate instruments that cover all or part of Minnesota

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for Minnesota. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Enacted legislation or regulation · Listed coverage: part of Minnesota

Southwest Power Pool: Conditional High Impact Large Load Service accepted by FERC (ER26-1323)

In effect · Southwest Power Pool region (multistate) · Regional grid

Effective: 1 July 2026

Issuing authority: Federal Energy Regulatory Commission

On 5 June 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 1 July 2026, that add Conditional High Impact Large Load Service, a non-firm transmission service that can serve a large load such as a data center before long-term firm service is available, for up to seven years and subject to curtailment.

Read the sourced record · Primary source

Enacted legislation or regulation · Listed coverage: part of Minnesota

Southwest Power Pool: High Impact Large Load study processes accepted by FERC (ER26-247)

In effect · Southwest Power Pool region (multistate) · Regional grid

Effective: 15 January 2026

Issuing authority: Federal Energy Regulatory Commission

On 14 January 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 15 January 2026, that add a High Impact Large Load study process and a generation assessment for those loads.

Read the sourced record · Primary source

Open the Minnesota policy comparison

Review dates: the 7 Minnesota records were last checked 23 September 2026 to 3 November 2026. 4 scheduled reviews are overdue as of the tracker date 3 November 2026: Electricity exemption removed after June 2025, 2025 data center act (H.F. 16), Qualified data center sales-tax exemption, Environmental Quality Board guidance on environmental review for data centers (FAQ) (last checked 23 September 2026, review due 23 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.