campus · MN · last checked 14 September 2026

Meta Rosemount Data Center

Lifecycle label: construction; effective date not established Status evidence: current City of Rosemount FAQ, corroborated by city and public-university records Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
meta-rosemount-data-center-mn
Record type
campus
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure
No selected publication source states critical-IT, gross-facility, utility-request, utility-service, generation, or measured-load MW.
Location
Rosemount, MN
County: Dakota County
approximate — The city places the 280-acre project in UMore Park directly east of Dakota County Technical College. No street address, parcel identifier, or coordinate is asserted.
Physical scale
Physical scale: The City of Rosemount's 2024 Annual Comprehensive Financial Report describes a 280-acre project and a 715,000-square-foot data center under construction. These are source-reported project figures, not surveyed current built area, commissioned IT space, a building count, or capacity.

What the sources support

The City of Rosemount's current water-supply FAQ says the data center in Rosemount is under construction, and the city's development page crosswalks Bigfoot/Jimnist to Meta. The city's 2024 Annual Comprehensive Financial Report describes the 280-acre Meta/Jimnist project as under construction. The University of Minnesota Office of General Counsel says the 280-acre sale to Jimnist closed December 29, 2023, identifies Meta Platforms, Inc. as Jimnist's parent, and says a data center was being constructed on the property. This supports construction on the current municipal statement; it does not establish completion, energization, operation, tenant use, or continuous progress.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 29 December 2023 · DataCenterData review

meta-rosemount-data-center-mn → Record

Why The University says its 280-acre sale to Jimnist LLC closed.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 14 September 2026 · DataCenterData review

meta-rosemount-data-center-mn → Publication

Why Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID meta-rosemount-data-center-mn and the page are prefilled. Accepted material corrections appear on Changes.