Licensed lead · not independently verified · dcd-dir-001744

AAIM Data Centers — Mountain Lake (Minnesota 3 Energy Park)

source-reported permitted

C-MN Data Centers Inc. / AAIM Data Centers

2203 3rd Avenue · Mountain Lake · Cottonwood County · Minnesota · 56159

Reported planned 10 MWSource updated 13 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AAIM Data Centers — Mountain Lake (Minnesota 3 Energy Park).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
C-MN Data Centers Inc. / AAIM Data Centers
Address and locality
2203 3rd Avenue · Mountain Lake · Cottonwood County · Minnesota · 56159
Official metro area
Outside an official metropolitan boundary
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
13 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001744

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
City of Mountain Lake municipal electric utilityUtility as named by the provider.
Power source
GridProvider label.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. Residents raised concerns about public notice, noise and proximity to homes and youth sports fields (July 2026). The city cites about $400,000/yr in electric-utility gross margin. In August 2026 the council confirmed the project is exempt from environmental review and took no further action.

What the source record says

The city specified AI only, with no bitcoin or cryptocurrency mining. It sits next to Milk Specialties and Balzer in the industrial district. In July 2026 the city said construction would likely start in September. That start is not confirmed, so status stays permitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-10-07 · source-reported proposed

    Council told Utilities Commission and P&Z will review an AI-only data center request (initial load 10 MW)

    Open cited source →

  2. 2025-11-17 · source-reported permitted

    Council approved Resolution #19-25 CUP 5-0

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID aaim-data-centers-mountain-lake-mn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001744

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 2203 3rd Avenue, Mountain Lake, MN 56159 · Cottonwood (Approximate location)

Roles

  • Operator: C-MN Data Centers Inc. / AAIM Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2024-10-07 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-11-17 · source-reported permitted

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: City of Mountain Lake municipal electric utility

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-13

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →