Operator-listed layer · Minnesota · not independently verified

Minnesota operator-listed data center sites

8 operator-listed sites (mixed units; not added to licensed rows) in Minnesota, as listed by operators on their own websites. Not independently verified and not a census.

8 operator-listed sites (mixed units; not added to licensed rows)2 with a published street and their own page
Read this before using the list.

Each site is what an operator states about itself on its own website, checked against the page DataCenterData captured; each fact links to that page. DataCenterData has not verified these sites independently. The list is not a census: it covers only the operators whose official U.S. portfolio pages could be captured with their robots rules respected. Units are mixed (buildings, facilities, campuses and provider presences where a suite or floor is listed), so the numbers are not building counts, and they are never added to licensed rows or reviewed records.

Showing all 8 operator-listed sites in Minnesota, sorted by name.

  1. Duluth Data Center

    Listed by Ark Data Centers on its website (captured 26 September 2026)

    Duluth, MN · Operator names this city; no street published

    Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    UPS design redundancy: 2N redundancy. Scope facility · design rating as stated. UPS design redundancy as the operator states it for this facility. Not battery runtime, UPS capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    Generator redundancy: N+1 redundancy. Scope facility · design rating as stated. Backup-generator redundancy as the operator states it for this facility. Not generator capacity, fuel or permitted output. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 26 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000269
  2. EdgeConneX MSP01

    Listed by EdgeConneX on its website (captured 25 September 2026)

    Minneapolis, MN · Operator names this city; no street published

    Operator’s facility code MSP01

    Floor area: 32,738 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Raised-floor or white-space area: 14,935 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000167
  3. Minneapolis II

    Listed by Stream Data Centers on its website (captured 27 September 2026)

    1706 West Creek Lane, Chaska, MN 55318

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000320
  4. MSI Data Center

    Listed by University of Minnesota on its website (captured 6 October 2026)

    117 Pleasant St. SE, Minneapolis, MN 55455

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000593
  5. MSP 01

    Listed by IronGate Data Centers on its website (captured 27 September 2026)

    Minneapolis, MN · Operator names this city; no street published

    Operator’s facility code MSP01

    Floor area: 85,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    Site area: 18 acres. Scope facility · current or planned not stated. Site area as stated for this facility. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000359
  6. MSP 02

    Listed by IronGate Data Centers on its website (captured 27 September 2026)

    Minneapolis, MN · Operator names this city; no street published

    Operator’s facility code MSP02

    Floor area: 300,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    Site area: 19 acres. Scope facility · current or planned not stated. Site area as stated for this facility. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000360
  7. MSP 03

    Listed by IronGate Data Centers on its website (captured 27 September 2026)

    Minneapolis, MN · Operator names this city; no street published

    Operator’s facility code MSP03

    Floor area: 310,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    Site area: 32 acres. Scope facility · current or planned not stated. Site area as stated for this facility. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

    FacilityLifecycle status is not published for this listing
    dcd-op-000361
  8. Paul Bunyan Communications Bemidji Offsite Backup & Storage

    Listed by Paul Bunyan Communications on its website (captured 28 September 2026)

    Bemidji, MN · Operator names this city; no street published

    Open the operator’s page → captured 28 September 2026

    FacilityLifecycle status is not published for this listing
    dcd-op-000468
Source and reuse

Facts compiled by DataCenterData from operators’ public pages, each with the operator-page link and capture date; no page text is republished and no license is granted. How this layer was collected →