Licensed discovery layer · Compute Atlas 1.33.0

Kentucky data center directory

Browse 21 licensed source rows in Kentucky. These discovery leads are not independently verified and are not a statewide census.

21 licensed rows17 eligible organization labels17 city/state labelsSource data updated through 15 September 2026

Kentucky map

Reported locations in Kentucky

21 licensed rows · 17 source localities · 6 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby group3 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 6 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record.

Two layers, two jobs. These licensed rows have not been independently verified by DataCenterData and are not a census. Reviewed evidence remains separate.

Browse by city

17 reported localities

City labels are reproduced as published. They are not inferred metro areas.

Showing 1–21 of 21 Kentucky licensed source rows.

  1. source-reported proposedCapacity not statedSource updated 15 September 2026approximate location
    View facility →dcd-dir-000440
  2. source-reported proposedPlanned 800 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-001139
  3. source-reported proposedPlanned 1,200 MWSource updated 13 September 2026approximate location
    View facility →dcd-dir-000849
  4. CyrusOne CIN6 (Florence)

    CyrusOne

    7190 Industrial Road · Florence · Boone County · Kentucky · 41042

    source-reported operationalOperational 5 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-000364
  5. source-reported proposedPlanned 70 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-000388
  6. source-reported proposedCapacity not statedSource updated 15 September 2026approximate location
    View facility →dcd-dir-000445
  7. source-reported operationalCapacity not statedSource updated 23 July 2026exact location
    View facility →dcd-dir-000652
  8. source-reported operationalCapacity not statedSource updated 23 July 2026exact location
    View facility →dcd-dir-000653
  9. source-reported under constructionPlanned 401 MWSource updated 15 September 2026exact location
    View facility →dcd-dir-001440
  10. source-reported proposedCapacity not statedSource updated 13 September 2026approximate location
    View facility →dcd-dir-000918
  11. Mason County Data Center Campus

    Undisclosed (Fortune 100 end user; rezoning sought through Mason County officials)

    Maysville · Mason County · Kentucky

    source-reported proposedPlanned 1,200 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-000915
  12. source-reported proposedPlanned 360 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-001021
  13. source-reported proposedPlanned 50 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-001053
  14. source-reported proposedPlanned 1,800 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-000211
  15. source-reported proposedCapacity not statedSource updated 10 September 2026approximate location
    View facility →dcd-dir-001103
  16. source-reported under constructionPlanned 402 MWSource updated 15 September 2026exact location
    View facility →dcd-dir-001137
  17. source-reported cancelledPlanned 600 MWSource updated 10 September 2026approximate location
    View facility →dcd-dir-001569
  18. source-reported proposedPlanned 2,000 MWSource updated 15 September 2026approximate location
    View facility →dcd-dir-001269
  19. source-reported proposedCapacity not statedSource updated 24 July 2026exact location
    View facility →dcd-dir-001437
  20. source-reported proposedPlanned 1,000 MWSource updated 15 September 2026exact location
    View facility →dcd-dir-001443
  21. source-reported proposedCapacity not statedSource updated 15 September 2026approximate location
    View facility →dcd-dir-001567
Source and reuse

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. DataCenterData normalized selected fields and added stable IDs. Download the attributed JSON →