This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for DartPoints Lexington Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- DartPoints
- Address and locality
- 745 West New Circle Road · Lexington · Fayette County · Kentucky
- Official metro area
- Lexington-Fayette, KY
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 70 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 15 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000388
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Kentucky Utilities (KU)
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 29.5 acres (source-reported; parcel boundary not established)
- Announced
- 27 May 2026
Provider notes
Energy. The property includes an owned on-site substation; DartPoints cites collaboration with Kentucky Utilities and LG&E, and WEKU reports KU supports the project.
Water. DartPoints describes 'direct-to-chip liquid cooling using closed-loop, low-water-use heat rejection' alongside support for traditional air-cooled environments.
What the source record says
Acquired in May 2026 for $29 million; roughly 343,000 sq ft of campus including about 81,000 sq ft of existing raised-floor data center space, fully zoned for data center use, with rack densities up to 200 kW planned. DartPoints describes a path to approximately 20–30 MW in an initial phase with longer-term expansion potential to 70 MW — the 70 MW build-out figure is what capacityMw.planned records. As of June 2026 the company was still finalizing a ready-for-service date and no operations date had been announced, so this is recorded as proposed rather than operational; Lexington declined to provide city incentives. Coordinates are a geocode of the street address, not a parcel-confirmed footprint.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-05-27 · source-reported proposed
DartPoints announced the acquisition of a 29.5-acre Lexington data center campus (the former Lexmark property) and plans to redevelop it for AI, neo-cloud, hyperscale and enterprise workloads.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- DartPoints Acquires Lexington, Kentucky Data Center Campus to Support AI, Neo-Cloud, Hyperscale, and Enterprise Demand · PR Newswire (DartPoints)
- Data center company plans to expand former Lexmark property for cloud, AI computing · WEKU
- DartPoints Acquires Lexington Data Center Campus for $29 Million · Smiley Pete Publishing
- DartPoints data center coming to Lexington won't get city incentives · WKYT
- OpenStreetMap/Nominatim geocode of 745 West New Circle Road, Lexington, Fayette County, KY · OpenStreetMap
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID dartpoints-lexington-fayette-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000388
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 745 West New Circle Road, Lexington, KY · Fayette (Approximate location)
Roles
- Operator: DartPoints
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 27 May 2026
Provider-reported announcement date.
- Status history: 2026-05-27 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 29.5 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 70 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Kentucky Utilities (KU)
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-15
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.