Operator-listed layer · Kentucky · not independently verified

Kentucky operator-listed data center sites

7 operator-listed sites (mixed units; not added to licensed rows) in Kentucky, as listed by operators on their own websites. Not independently verified and not a census.

7 operator-listed sites (mixed units; not added to licensed rows)5 with a published street and their own page
Read this before using the list.

Each site is what an operator states about itself on its own website, checked against the page DataCenterData captured; each fact links to that page. DataCenterData has not verified these sites independently. The list is not a census: it covers only the operators whose official U.S. portfolio pages could be captured with their robots rules respected. Units are mixed (buildings, facilities, campuses and provider presences where a suite or floor is listed), so the numbers are not building counts, and they are never added to licensed rows or reviewed records.

Showing all 7 operator-listed sites in Kentucky, sorted by name.

  1. Calvert 1, 2, & 3

    Listed by Core Scientific on its website (captured 26 September 2026)

    1035 Shar-Cal Rd, Calvert City, KY 42029

    CampusLifecycle status is not published for this listing
    View listing →dcd-op-000279
  2. Gearheart Data Center

    Listed by Gearheart Data Center on its website (captured 28 September 2026)

    1003 Winchester Road, Lexington, KY 40505

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000442
  3. IgLou Colocation

    Listed by IgLou Internet Services on its website (captured 28 September 2026)

    3315 Gilmore Industrial Blvd., Louisville, KY 40213

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000398
  4. Louisville Data Center

    Listed by Cogent Communications on its website (captured 25 September 2026)

    332 W Broadway, Louisville, KY 40202

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000043
  5. Louisville Data Center

    Listed by Aphorio Carter on its website (captured 6 October 2026)

    Louisville, KY · Operator names this city; no street published

    Floor area: 102,500 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Raised-floor or white-space area: 10,000 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Site area: 30 acres. Scope facility · current or planned not stated. Site area as stated for this facility. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    UPS design redundancy: N+1 redundancy. Scope facility · design rating as stated. UPS design redundancy as the operator states it for this facility. Not battery runtime, UPS capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Aphorio Carter · Louisville Data Center — Additional operator-reported details

    • Certification or compliance claim: Company states LEED Gold certification Certification · facility scope

      Company-reported. Not independently verified.

      A company statement. No issuer record confirming it for this site is recorded here.

      Open cited source → Captured 2026-10-06.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000572
  6. Louisville, KY

    Listed by Data Canopy on its website (captured 27 September 2026)

    1208 Quality Choice Place, Louisville, KY 40210

    FacilityLifecycle status is not published for this listing
    View listing →dcd-op-000354
  7. Simpsonville Data Center

    Listed by Aphorio Carter on its website (captured 6 October 2026)

    Simpsonville, KY · Operator names this city; no street published

    Critical IT: 1 MW. Scope facility · current or planned not stated. Critical IT capacity as stated for this facility. Not utility power, generation, or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Floor area: 102,500 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Raised-floor or white-space area: 10,000 square feet. Scope facility · current or planned not stated. Raised-floor or white-space area as stated for this facility. Not the total floor area of the building or campus. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Site area: 21 acres. Scope facility · current or planned not stated. Site area as stated for this facility. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    UPS design redundancy: N+1 redundancy. Scope facility · design rating as stated. UPS design redundancy as the operator states it for this facility. Not battery runtime, UPS capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 6 October 2026.

    Aphorio Carter · Simpsonville Data Center — Additional operator-reported details

    • Certification or compliance claim: Company states LEED Gold certification Certification · facility scope

      Company-reported. Not independently verified.

      A company statement. No issuer record confirming it for this site is recorded here.

      Open cited source → Captured 2026-10-06.

    Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

    Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

    FacilityLifecycle status is not published for this listing
    dcd-op-000573
Source and reuse

Facts compiled by DataCenterData from operators’ public pages, each with the operator-page link and capture date; no page text is republished and no license is granted. How this layer was collected →