North Dakota index · last changed 26 September 2026

North Dakota data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of North Dakota data centers.

8 sourced policy records for North Dakota ↓Facility register: 8 records · by county →2 published DataCenterData records · evidence status shown per row3 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore North Dakota

Map, listings and checked facts.

Start with 3 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

North Dakota map

Reported locations in North Dakota

3 licensed rows · 3 source localities · 3 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 13 data-center source listings here across licensed, operator and DataCenterData layers (4 with a map point); 13 with government registry records. Source listings are not distinct sites.
Browse 3 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

3 licensed rows3 reported city labels1 eligible organization labels

Browse all 3 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported operationalReported planned 400 MWReported operational 100 MWSource updated 10 October 2026approximate location
  2. source-reported under constructionReported planned 280 MWSource updated 10 October 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

8 operator-listed sites (mixed units; not added to licensed rows) in North Dakota →

7 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

North Dakota evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
2
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
3 not independently verified
Capacity boundary stated
1 of 2 published DataCenterData rows
Review timing
Audit through 12 September 2026 · next 25 March 2027
Known coverage gap

No North Dakota Department of Commerce record was opened.

Browse all 3 North Dakota licensed leads → · Why these counts differ →

Campuses

2 campus records. Names are as they appear on each record page.

Campuses published for North Dakota
Record / rolesStatusCapacity / scalePrimary evidence
Polaris Forge 2 constructioncampus 200 MWCritical IT · phase scopeThe filing describes a data-center lease to deliver 200 MW of critical IT load to an unnamed hyperscaler, phased across the initial two buildings. This is contracted future critical IT load, not current or measured load, utility-service capacity or an entire future-campus total. Applied Digital Form 10-Q for the quarter ended February 28, 2026 →Gov. record
Polaris Forge 1Operator: Applied Digital · Developer: Applied Digital expandingcampus · operator-reported operator-reported live 175 MWCapacity type not recorded · campus scopeOperator-reported "total live capacity at the campus" on July 1, 2026, after Phase 1 of Building 2 (75 MW) entered service. The release does not state whether this is critical IT load; the 10-K states the first building's roughly 100 MW as critical IT load. This is the operator's figure for capacity in service, not measured electricity use, utility service capacity or the planned total. The 400 MW contracted at full build-out is a separate planned figure (see physical scale). Applied Digital Form 10-K for the fiscal year ended May 31, 2026 →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 12 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 25 March 2027.

2 independently source-linked project/campus records; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Hanover, Harwood. Their listings above are source listings to investigate. No statewide evidence answer is published for North Dakota either; statewide and utility-territory rules are under Policy tracker below.

Policy tracker

North Dakota policy records

8 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 3 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Enacted legislation or regulation

Montana-Dakota Rate 45 for data center-type high density loads (10 MW and above)

In effect · Montana-Dakota Utilities electric service area, North Dakota · Utility territory

Effective: 1 July 2023

Issuing authority: Montana-Dakota Utilities Co.

Montana-Dakota Utilities offers North Dakota Rate 45 for data center-type facilities housing high density computer processing technology that expect at least 10,000 kW of monthly demand and an 85 percent load factor.

Read the sourced record · Primary source

Pending or nonbinding 2 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Regulatory or tariff proceeding

ND PSC PU-26-235: MDU service agreement for a data center near Center (pending)

Pending proceeding · Montana-Dakota Utilities service near Center, North Dakota · State

Source document: 26 June 2026

Issuing authority: North Dakota Public Service Commission

Montana-Dakota Utilities Co. asked the North Dakota Public Service Commission on 26 June 2026 to approve an electric service agreement with APLD BIS-01 LLC for a high-density data center near Center, North Dakota.

Read the sourced record · Primary source

Regulatory or tariff proceeding

Otter Tail proposed high power compute rate for data center load

Pending proceeding · Otter Tail Power Company service area, North Dakota · Utility territory

Source document: 18 June 2026

Issuing authority: Otter Tail Power Company (petition filed with the North Dakota Public Service Commission)

Otter Tail Power Company petitioned the North Dakota Public Service Commission on 18 June 2026 to create a class for very large customers and a high power compute rate schedule for customers with at least 75 MW of firm data center load, structured as take-or-pay service that assigns data center costs to the data center, with a proposed start of 1 January 2027.

Read the sourced record · Primary source

History 3 records

Expired, repealed, vetoed, failed, blocked, superseded and completed measures remain visible without being presented as current.

Expired, repealed, vetoed or blocked action

Earlier data center sales tax exemption (expired 2020)

Expired · North Dakota · State

Ended: 31 December 2020

Issuing authority: North Dakota Legislative Assembly

North Dakota enacted a sales and use tax exemption for enterprise information technology equipment and software used in a qualified data center through House Bill 1089 in 2015, codified as section 57-39.2-04.13.

Read the sourced record · Primary source

Federal and multistate

Federal and multistate instruments that cover all or part of North Dakota

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for North Dakota. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Enacted legislation or regulation · Listed coverage: part of North Dakota

Southwest Power Pool: Conditional High Impact Large Load Service accepted by FERC (ER26-1323)

In effect · Southwest Power Pool region (multistate) · Regional grid

Effective: 1 July 2026

Issuing authority: Federal Energy Regulatory Commission

On 5 June 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 1 July 2026, that add Conditional High Impact Large Load Service, a non-firm transmission service that can serve a large load such as a data center before long-term firm service is available, for up to seven years and subject to curtailment.

Read the sourced record · Primary source

Enacted legislation or regulation · Listed coverage: part of North Dakota

Southwest Power Pool: High Impact Large Load study processes accepted by FERC (ER26-247)

In effect · Southwest Power Pool region (multistate) · Regional grid

Effective: 15 January 2026

Issuing authority: Federal Energy Regulatory Commission

On 14 January 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 15 January 2026, that add a High Impact Large Load study process and a generation assessment for those loads.

Read the sourced record · Primary source

Open the North Dakota policy comparison

Review dates: the 8 North Dakota records were last checked 23 September 2026 to 3 November 2026. 1 scheduled review is overdue as of the tracker date 3 November 2026: Dickey County: zoning standards for data centers (last checked 23 September 2026, review due 23 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.