Reported planned 280 MWSource updated 10 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Applied Digital Polaris Forge 2.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Applied Digital Corporation
Address and locality
Harwood · Cass County · North Dakota
Official metro area
Fargo, ND-MN
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 280 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 October 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000086

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Cass County Electric Cooperative / Minnkota Power CooperativeUtility as named by the provider.
Power source
GridProvider label.
Land area
900 acres (source-reported; parcel boundary not established)
Announced investment
$3 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
200 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
August 2025Provider-reported announcement date.

Provider notes

Energy. 280 MW peak demand; power secured through Cass County Electric Cooperative, a member-owned nonprofit, in partnership with Minnkota Power Cooperative

Community. Opposition surfaced when the project was announced (Aug 2025): environmental advocates and at least one area farmer argued Minnkota Power Cooperative member-owners (farmers, ranchers, rural residents) could see higher electric rates from the substation/powerline buildout funded to serve the data center; one resident called for a moratorium to allow more planning time. No vote, denial, or litigation reported as of 2026-03-23; the ND Public Service Commission went on to approve the power project 2026-04-29/30.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

Two purpose-built facilities totaling more than 1.8 million sq ft. As of the August 2025 announcement, Applied Digital was in advanced negotiations with a U.S.-based investment-grade hyperscaler; no customer or lease value publicly confirmed. Partial operations expected end of 2026; full capacity early 2027. Coordinates are Harwood city centroid; site is approximately 900 acres near this community north of Fargo.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-08 · source-reported proposed

    Polaris Forge 2 announced; $3B, 280 MW AI factory campus on 900+ acres near Harwood

    Open cited source →

  2. 2025-09 · source-reported under construction

    Groundbreaking September 2025; initial operations expected end of 2026, full capacity early 2027

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID applied-digital-polaris-forge-2-harwood-nd. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Independently reviewed match

This exact source identifier is linked to Polaris Forge 2. The licensed row remains a separate discovery record.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000086

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Harwood, ND · Cass (Approximate location)

Roles

  • Operator: Applied Digital Corporation

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: August 2025

    Provider-reported announcement date.

  • Status history: 2025-08 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-09 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 900 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 280 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Cass County Electric Cooperative / Minnkota Power Cooperative

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $3 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 200 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →