Polaris Forge 2

Lifecycle label: construction; effective date not established Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
applied-digital-polaris-forge-2-harwood-nd
Record type
campus
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
200 MW critical it · phase scope
The filing describes a data-center lease to deliver 200 MW of critical IT load to an unnamed hyperscaler, phased across the initial two buildings. This is contracted future critical IT load, not current or measured load, utility-service capacity or an entire future-campus total.
Location
ND
approximate — The SEC filing says near Harwood, North Dakota and elsewhere calls it the company's campus in Harwood. It gives no street address, parcel, county or coordinates; Harwood is retained only in the stable ID as the source's place label.
Physical scale
Physical scale: The leased initial 200 MW is phased across two buildings expected to come online in 2026. These are planned construction-phase buildings, not two operating facilities and not a complete campus building count.

What the sources support

Applied Digital's Form 10-Q filed April 8, 2026 says the Polaris Forge 2 project near Harwood had begun; Note 14 says the campus was currently under construction. Expected future online dates are forecasts and do not establish operation.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 20 October 2025 · DataCenterData review

applied-digital-polaris-forge-2-harwood-nd → Record

Why Applied Digital subsidiaries entered the filed lease for 200 MW of critical IT load at Polaris Forge 2.

Evidence No additional evidence link; see the linked record or claim.

Record history · 8 April 2026 · DataCenterData review

applied-digital-polaris-forge-2-harwood-nd → Record

Why Applied Digital filed the Form 10-Q describing Polaris Forge 2 as under construction.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 13 September 2026 · DataCenterData review

applied-digital-polaris-forge-2-harwood-nd → Publication

Why Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.

Evidence No additional evidence link; see the linked record or claim.