Licensed lead · not independently verified · dcd-dir-000546

EdgeCore Reno Data Center Campus

source-reported under construction

EdgeCore Digital Infrastructure

3000 NV-439 · McCarran · Storey County · Nevada · 89434

Reported planned 216 MWSource updated 14 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for EdgeCore Reno Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
EdgeCore Digital Infrastructure
Address and locality
3000 NV-439 · McCarran · Storey County · Nevada · 89434
Official metro area
Reno, NV
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 216 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000546

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
HybridProvider label.
Land area
56 acres (source-reported; parcel boundary not established)
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
August 2023Provider-reported announcement date.

Provider notes

Water. EdgeCore states a flexible cooling design supporting both air-cooled and direct-to-chip liquid-cooled servers, with a WUE rating below 0.01 L/kWh.

What the source record says

Three hyperscale buildings totalling nearly 1 million sq ft at roughly 72 MW each. Sources diverge on framing: the 2023 announcement describes 136 acres in 'north Reno' supporting 400+ MW, while EdgeCore's current location page describes a 56-acre, 216 MW developed phase in the Tahoe-Reno Industrial Center (Storey County). The current page is treated as authoritative for the developed campus; the larger land position is recorded here rather than as capacity.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-08-10 · source-reported proposed

    EdgeCore announced the purchase of 136 acres in the greater Reno market for a campus capable of supporting over 400 MW of critical load.

    Open cited source →

  2. 2026-01 · source-reported under construction

    EdgeCore reported active construction under way on the first of three data centers at the Greater Reno campus.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID edgecore-reno-campus-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by EdgeCore on its website (captured 5 October 2026)
Name as listed
Reno
Address as published
Reno, NV

Lifecycle status is not published for this listing.

Critical IT: 216 MW. Scope campus · stated as planned. Critical IT capacity as stated for this campus. Not utility power, generation, or measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 5 October 2026.

Site area: 56 acres. Scope campus · stated as planned. Site area as stated for this campus. Land area as stated; not building floor area. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 5 October 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on the same specific operator facility page already cited by this record, with independently reviewed subject identity; no new address or boundary is established.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000546

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • 3000 NV-439, McCarran, NV 89434 · Storey (Approximate location)

Roles

  • Operator: EdgeCore Digital Infrastructure

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: August 2023

    Provider-reported announcement date.

  • Status history: 2023-08-10 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-01 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 56 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 216 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →