This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for EdgeCore Reno Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- EdgeCore Digital Infrastructure
- Address and locality
- 3000 NV-439 · McCarran · Storey County · Nevada · 89434
- Official metro area
- Reno, NV
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 216 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000546
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Cooling
- Hybrid
- Land area
- 56 acres (source-reported; parcel boundary not established)
- AI-use label (provider)
- confirmed
- Announced
- August 2023
Provider notes
Water. EdgeCore states a flexible cooling design supporting both air-cooled and direct-to-chip liquid-cooled servers, with a WUE rating below 0.01 L/kWh.
What the source record says
Three hyperscale buildings totalling nearly 1 million sq ft at roughly 72 MW each. Sources diverge on framing: the 2023 announcement describes 136 acres in 'north Reno' supporting 400+ MW, while EdgeCore's current location page describes a 56-acre, 216 MW developed phase in the Tahoe-Reno Industrial Center (Storey County). The current page is treated as authoritative for the developed campus; the larger land position is recorded here rather than as capacity.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023-08-10 · source-reported proposed
EdgeCore announced the purchase of 136 acres in the greater Reno market for a campus capable of supporting over 400 MW of critical load.
- 2026-01 · source-reported under construction
EdgeCore reported active construction under way on the first of three data centers at the Greater Reno campus.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- EdgeCore Reno data center campus - 56 acres, 216 MW critical IT load across three buildings in the Tahoe-Reno Industrial Center · EdgeCore Digital Infrastructure
- EdgeCore Digital Infrastructure announces development of Reno, Nevada data center campus · EdgeCore Digital Infrastructure
- EdgeCore Reno data center - 3000 NV-439, under construction · Baxtel
- PeeringDB facility registry (Nevada) - EdgeCore Reno 1, org EdgeCore Digital Infrastructure, 3000 USA Parkway, McCarran 89434 · PeeringDB
- NDEP Class II Air Quality Operating Permit AP7374-4772 issued to MECP1 Reno 1, LLC (RNO1), 3000 USA Parkway, McCarran NV 89437 - Storey County, 126 diesel emergency generators plus 2 fire pumps · Nevada Division of Environmental Protection
- Development panel discusses data centers in Northern Nevada · Northern Nevada Business Weekly
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID edgecore-reno-campus-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Reno
- Address as published
- Reno, NV
Lifecycle status is not published for this listing.
Critical IT: 216 MW.
Site area: 56 acres.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000546
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 3000 NV-439, McCarran, NV 89434 · Storey (Approximate location)
Roles
- Operator: EdgeCore Digital Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: August 2023
Provider-reported announcement date.
- Status history: 2023-08-10 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-01 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 56 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 216 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Cooling, water, PUE and WUE
- Cooling: Hybrid
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.