This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for PowerHouse Reno Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- PowerHouse Data Centers
- Address and locality
- 600 Britain Drive · McCarran · Storey County · Nevada
- Official metro area
- Reno, NV
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 65 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001141
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 49 acres (source-reported; parcel boundary not established)
- AI-use label (provider)
- likely
- Announced
- October 2024
What the source record says
Three two-story powered-shell buildings totalling 900,000 sq ft on 49 acres, developed with parent American Real Estate Partners (AREP). The 65 MW figure is the campus figure in PowerHouse's own groundbreaking release; a facility directory separately lists a 200 MW figure for the site, which is not recorded here because it was not read on a primary page this session.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-10 · source-reported under construction
PowerHouse broke ground on the 49-acre, three-building, 900,000 sq ft campus at the Tahoe Reno Industrial Center; first building targeted for Q3 2025 and full campus completion in 2028.
Sources and attribution
- PowerHouse breaks ground on Reno data center · PowerHouse Data Centers
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID powerhouse-reno-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001141
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 600 Britain Drive, McCarran, NV · Storey (Approximate location)
Roles
- Operator: PowerHouse Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: October 2024
Provider-reported announcement date.
- Status history: 2024-10 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 49 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 65 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.