This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for EdgeCore Culpeper Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- EdgeCore Digital Infrastructure
- Address and locality
- Culpeper · Culpeper County · Virginia
- Official metro area
- Washington-Arlington-Alexandria, DC-VA-MD-WV
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 216 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 27 August 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000544
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Rappahannock Electric Cooperative
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 120 acres (source-reported; parcel boundary not established)
- Announced
- 18 July 2024
Provider notes
Energy. Initial power delivery expected in early 2028.
Water. Air-cooled, closed-loop system; operator states a water usage effectiveness rating below 0.01 L/kWh.
What the source record says
120 acres inside the 690-acre Culpeper Technology Zone, about 60 miles from Ashburn. capacityMw.planned records the initial 216 MW critical IT load; the 432 MW figure is a potential expansion, not a committed build. Distinct from the already-tracked Red Ace Data Center in Culpeper County (different operator and site) and from EdgeCore's tracked Shannon Hill campus in Louisa County. Coordinates are an approximate geocode of the Culpeper Technology Zone.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-07-18 · source-reported proposed
EdgeCore announced acquisition of 120 acres in the Culpeper Technology Zone for a 1.4 million sq ft campus, initially supporting 216 MW of critical IT load with potential expansion to 432 MW.
Sources and attribution
- EdgeCore Digital Infrastructure Announces New Hyperscale Data Center Market in Culpeper, Virginia · EdgeCore Digital Infrastructure
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID edgecore-culpeper-tech-zone-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000544
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Culpeper, VA (Approximate location)
Roles
- Operator: EdgeCore Digital Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 18 July 2024
Provider-reported announcement date.
- Status history: 2024-07-18 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 120 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 216 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Rappahannock Electric Cooperative
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-27
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.