This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for EdgeCore Shannon Hill Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- EdgeCore Digital Infrastructure
- Address and locality
- Louisa County · Virginia
- Official metro area
- Richmond, VA
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 1,100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000547
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Rappahannock Electric Cooperative
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 697 acres (source-reported; parcel boundary not established)
- Announced investment
- $17 billion
- AI-use label (provider)
- likely
- Announced
- 24 June 2025
Provider notes
Water. Reported closed-loop air-cooled system.
What the source record says
697-acre / 3.9M sq ft high-density campus in Shannon Hill Regional Business Park, Louisa County, less than 1 mile from I-64 Exit 148 (Shannon Hill). Coordinates are an approximate geocode of the Shannon Hill interchange, not a parcel-confirmed point. Public-reception check (2026-09-10): Shannon Hill Regional Business Park was rezoned for tech-sector use in 2019, years before EdgeCore's 2025 project announcement, so the campus is permitted by-right and did not trigger a new public rezoning hearing. A July 2025 Louisa County opposition wave (see aws-north-creek-technology-campus-louisa-va) explicitly named EdgeCore Shannon Hill as a separate, not-yet-controversial project at that time. No hearing record, resident objection, or support statement specific to Shannon Hill was found. Checked: DCD's original announcement piece (403'd, could not fetch directly) plus search-indexed coverage confirming the by-right/2019-rezoning status.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-06-24 · source-reported proposed
EdgeCore purchased 697 acres in the Shannon Hill Regional Business Park from Louisa County ($42M) to develop a 3.9M sq ft, 1.1+ GW campus (~$17B).
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- EdgeCore to develop 1.1GW data center in Louisa County, Virginia · Data Center Dynamics
- EdgeCore to invest $17B in Louisa County data center campus · Virginia Business
- Louisa County Sale of Shannon Hill Regional Business Park · Louisa County, VA (government)
- EdgeCore announces plans to invest $17B+ in Louisa County, VA (1.1+ GW campus) · EdgeCore Digital Infrastructure
- EdgeCore: Shannon Hill Campus Data Center · Baxtel
- EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA through the Development of 1.1+ Gigawatt Data Center Campus · EdgeCore Digital Infrastructure
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID edgecore-shannon-hill-louisa-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000547
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- VA · Louisa (Approximate location)
Roles
- Operator: EdgeCore Digital Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 24 June 2025
Provider-reported announcement date.
- Status history: 2025-06-24 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 697 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Rappahannock Electric Cooperative
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $17 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.