This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for AWS Industrial Parkway Campus (Jerome Township).
Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Plain City · Union County · Ohio
- Official metro area
- Columbus, OH
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 24 July 2026
- Location precision
- exact (provider label)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000145
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Consolidated Electric Coop
- Power source
- Grid
- Land area
- 86.18 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: mixed
- AI-use label (provider)
- likely
Provider notes
Energy. AWS Industrial Parkway Campus (8619 Industrial Parkway, Plain City, 98 acres in Union County's Jerome Township) connects to the Consolidated Electric Coop grid per public data-center registries. No site-specific clean-energy PPA or on-site generation found.
Community. Jerome Township imposed a 9-month moratorium on new data-center development in September 2025 amid resident concerns; the existing AWS campuses continue operating.
What the source record says
Operational AWS data center on an ~86-acre Amazon Data Services Inc parcel at 8565 Industrial Pkwy, Jerome Township / Plain City, Union County — part of Amazon's AWS US-East-2 (Ohio) cluster in the Jerome Township / 'New California' corridor first announced Nov 2019 ($200M, ~125 acres at the NW corner of Warner Rd / Industrial Pkwy). Union County Auditor building record: year built 2024, ~215,000 sq ft assessed, $46.9M appraised building value. Sits ~2 km north of the Amazon Warner Rd campus (tracked separately) and is distinct from the still-vacant AWS 'Project Cosmos' site ~9 mi north in Marysville (Paris Township). No site-specific IT-load MW is disclosed. Coordinates are the Union County Auditor parcel centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024 · source-reported operational
Union County Auditor records the Amazon Data Services Inc building as year built 2024 (~215,000 sq ft assessed, $46.9M appraised building value); WOSU (Sept 2025) confirms two operational AWS data centers in Jerome Township.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Union County Auditor building record (parcel 1500220390010 / 8565 Industrial Pkwy — Amazon Data Services Inc, year built 2024, ~215,000 sq ft, $46.9M appraised building value, 86.2 ac) · Union County Auditor GIS / Assessor
- Amazon primed: Technology giant plans $200 million data center in Union County (Nov 2019) — the Jerome Township AWS cluster origin announcement, ~125 ac at NW corner of Warner Rd / Industrial Pkwy · Marysville Journal-Tribune
- Jerome Township puts pause on new data center development for nine months (Sep 2025) — confirms two operational AWS data centers in Jerome Township; AWS paid $1.1M Union County property tax in 2024 · WOSU Public Media
- Amazon AWS Industrial Parkway Campus — Plain City, OH (datacenter.fyi)
- Amazon AWS CMH - Industrial Parkway Campus (Datacentermap)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-industrial-parkway-jerome-township-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000145
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Plain City, OH · Union (Exact location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2024 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 86.18 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Consolidated Electric Coop
Utility as named by the provider.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-24
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.