This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for AWS New Albany (Beech/Miller Road Campus).
Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- New Albany · Licking County · Ohio
- Official metro area
- Columbus, OH
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 8 August 2026
- Location precision
- exact (provider label)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000121
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 458 acres (source-reported; parcel boundary not established)
- Announced investment
- $3.5 billion
- Announced
- September 2023
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- New Albany data-center property-tax abatement (100% for 15 years, then 75% for 15 years) · City of New Albany / Community Reinvestment Area · 2023 Open cited source →
What the source record says
AWS's Licking-side New Albany expansion: a $3.5B, five-building, ~1.25M sq ft campus (announced Sept 2023, targeted through 2030) on the Amazon Data Services Beech Rd NW / Miller Rd NW parcel cluster (~458 ac). Two buildings were completed and staffed as of Aug 2025; the remainder are under construction. Adjacent to (but distinct from) AWS's pre-existing 2570 Beech Rd "Ridge Two" campus (operational since ~2017, a separate parcel not in this record). No site-specific IT-load MW is disclosed (a widely-repeated 500 MW figure is an AWS us-east-2 regional aggregate, not this campus). Amazon's 2023 Ohio Job Creation Tax Credit is a multi-site umbrella (17 facilities across Franklin/Licking/Union counties), not specific to this parcel. Distinct from tracked aws-cosgray-hilliard-oh and aws-scioto-darby-hilliard-oh (Hilliard, Franklin County, west of Columbus). Status refresh 2026-08-08: the completion target has PASSED without confirmation. As of the city's 2025-08-07 update, two campus buildings were finished and staffed (tracked separately as the 2550 and 3180 Beech Road records) with the remainder "expected to be operational by the end of the year" — i.e. end-2025. No fetched source confirms that happened, so this record stays under_construction rather than being promoted on an expectation. Worth re-checking with a Licking County occupancy or AWS regional announcement.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023-09 · source-reported under construction
$3.5B five-building expansion announced Sept 2023; two buildings completed and staffed by Aug 2025, remainder under construction
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Licking County parcel/GIS record (AMAZON DATA SERVICES INC — Beech Rd NW / Miller Rd NW cluster; anchor parcel 095-111408, 199.81 ac) · Licking County Auditor GIS / Assessor
- Amazon Investment in New Albany Contributes $1.4 Billion to Licking County GDP · City of New Albany
- Amazon Web Services Announces Plan to Invest $3.5 Billion in New Albany by 2030 · City of New Albany
- AWS Readies $3.5B for 5 More Ohio Data Centers in New Albany · Data Center Frontier
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-beech-road-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000121
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- New Albany, OH · Licking (Exact location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: September 2023
Provider-reported announcement date.
- Status history: 2023-09 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 458 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced investment: $3.5 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: New Albany data-center property-tax abatement (100% for 15 years, then 75% for 15 years) · City of New Albany / Community Reinvestment Area · 2023
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-08
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.