Licensed lead · not independently verified · dcd-dir-000121

AWS New Albany (Beech/Miller Road Campus)

source-reported under construction

Amazon Web Services

New Albany · Licking County · Ohio

Capacity not statedSource updated 8 August 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AWS New Albany (Beech/Miller Road Campus).

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Amazon Web Services
Address and locality
New Albany · Licking County · Ohio
Official metro area
Columbus, OH
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
8 August 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000121

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
458 acres (source-reported; parcel boundary not established)
Announced investment
$3.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced
September 2023Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • New Albany data-center property-tax abatement (100% for 15 years, then 75% for 15 years) · City of New Albany / Community Reinvestment Area · 2023 Open cited source →

What the source record says

AWS's Licking-side New Albany expansion: a $3.5B, five-building, ~1.25M sq ft campus (announced Sept 2023, targeted through 2030) on the Amazon Data Services Beech Rd NW / Miller Rd NW parcel cluster (~458 ac). Two buildings were completed and staffed as of Aug 2025; the remainder are under construction. Adjacent to (but distinct from) AWS's pre-existing 2570 Beech Rd "Ridge Two" campus (operational since ~2017, a separate parcel not in this record). No site-specific IT-load MW is disclosed (a widely-repeated 500 MW figure is an AWS us-east-2 regional aggregate, not this campus). Amazon's 2023 Ohio Job Creation Tax Credit is a multi-site umbrella (17 facilities across Franklin/Licking/Union counties), not specific to this parcel. Distinct from tracked aws-cosgray-hilliard-oh and aws-scioto-darby-hilliard-oh (Hilliard, Franklin County, west of Columbus). Status refresh 2026-08-08: the completion target has PASSED without confirmation. As of the city's 2025-08-07 update, two campus buildings were finished and staffed (tracked separately as the 2550 and 3180 Beech Road records) with the remainder "expected to be operational by the end of the year" — i.e. end-2025. No fetched source confirms that happened, so this record stays under_construction rather than being promoted on an expectation. Worth re-checking with a Licking County occupancy or AWS regional announcement.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-09 · source-reported under construction

    $3.5B five-building expansion announced Sept 2023; two buildings completed and staffed by Aug 2025, remainder under construction

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-beech-road-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000121

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • New Albany, OH · Licking (Exact location)

Roles

  • Operator: Amazon Web Services

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: September 2023

    Provider-reported announcement date.

  • Status history: 2023-09 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 458 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $3.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Incentive reported by the source: New Albany data-center property-tax abatement (100% for 15 years, then 75% for 15 years) · City of New Albany / Community Reinvestment Area · 2023

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →