Vantage Data Centers OH1

source-reported under construction

Vantage Data Centers

Johnstown · Licking County · Ohio

Reported planned 192 MWSource updated 10 September 2026exact location (provider label) · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Vantage Data Centers OH1.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Vantage Data Centers
Address and locality
Johnstown · Licking County · Ohio
Official metro area
Columbus, OH
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 192 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001531

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
American Electric Power (AEP Ohio)Utility as named by the provider.
Power source
GridProvider label.
Land area
70 acres (source-reported; parcel boundary not established)
Announced investment
$2 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Grid-only. Data Center Frontier: power for the 70-acre, 192MW (3x64MW) OH1 campus comes from a dedicated local 300 MVA N+1 AEP substation (delivered ~Q4 2024), with 'renewable energy sources and their development credits available above the meter' — i.e., an optional REC/PPA-style overlay.

Community. New Albany Mayor Sloan Spalding and JobsOhio's Dave Brewster are quoted welcoming the project at its 2024-10-25 groundbreaking, alongside a New Albany City Council member and local economic-development/community-foundation figures. No opposition or resident concerns documented. Checked: operator press release only.

What the source record says

3325 Horizon Court, Johnstown — Licking County section of the New Albany International Business Park. Vantage's first Midwest campus and seventh North American market. 3 buildings, 1.5M+ sq ft total, 192MW total planned IT capacity (not yet fully operational). LEED Silver target, part of Vantage's 2030 net-zero operational carbon commitment. Vantage's own press release states OH1 "will provide secure and reliable infrastructure for cloud technologies and artificial intelligence" — real operator-stated AI-adjacent marketing (paired with "cloud," not an exclusive/GPU-specific claim), so tagged aiClassification: likely rather than confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-10 · source-reported under construction

    Groundbreaking October 25, 2024. First of three buildings targeted operational late 2025/December 2025; additional phases through 2028.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID vantage-oh1-new-albany-licking-county-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001531

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Johnstown, OH · Licking (Exact location)

Roles

  • Operator: Vantage Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2024-10 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 70 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 192 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: American Electric Power (AEP Ohio)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $2 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →