Reported geography
Source-reported location for CyrusOne New Albany COL-1.
Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CyrusOne
- Address and locality
- Johnstown · Licking County · Ohio
- Official metro area
- Columbus, OH
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 18 July 2026
- Location precision
- exact (provider label)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000369
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 93.8 acres (source-reported; parcel boundary not established)
- Announced investment
- $150 million
What the source record says
12181 Jug St, Johnstown — in the Licking County section of the New Albany International Business Park. 274,518 sq ft, two-story building. Ohio Tax Credit Authority approved a 10-year, 75% data center sales tax exemption valued at $5.4M (approved ~April 2024). No IT-load MW figure is publicly disclosed for this site — an earlier 60MW figure found in some secondary sources actually belongs to a different operator's nearby New Albany campus (STACK Infrastructure NAL01) and is not attributable to CyrusOne COL-1; capacityMw is omitted rather than guessed. No AI/HPC-specific marketing found — treated as generic hyperscale colo.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · source-reported under construction
Ceremonial groundbreaking September 18, 2025; state filings show construction beginning November 1, 2024. Estimated construction completion September 22, 2026.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Permits offer details after groundbreaking of $150 million New Albany data center · NBC4 (WCMH)
- CyrusOne breaks ground on New Albany, Ohio data center · Data Center Dynamics
- Licking County parcel/GIS record (parcel 095-112236-00.000 (PID 95785)) · Licking County GIS / Assessor
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cyrusone-new-albany-col1-licking-county-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000369
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Johnstown, OH · Licking (Exact location)
Roles
- Operator: CyrusOne
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-09 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 93.8 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced investment: $150 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-18
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.