Chirisa Technology Park — Richmond (Chester)

source-reported under construction

PowerHouse Data Centers

Chester · Chesterfield County · Virginia

Reported planned 120 MWSource updated 8 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Chirisa Technology Park — Richmond (Chester).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
PowerHouse Data Centers
Address and locality
Chester · Chesterfield County · Virginia
Official metro area
Richmond, VA
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 120 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
8 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001133

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Dominion EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. 300 MW secured via a new Meadowville Technology Park substation built in partnership with Dominion Energy; eventual park goal >1 GW.

Water. Chirisa 'direct-on-chip' liquid cooling (closed-loop, ~2x more power-efficient than air-cooled); site water sourced from a Chesterfield County reclaimed-water system. No MGD figure published.

Community. The Chesterfield County Board of Supervisors approved the Chirisa / Meadowville plans and cited a positive economic impact (redevelopment of the former Capital One campus); county-wide, data-center expansion is actively debated (residential-bill, water, and diesel-generator concerns; a Jan 2026 zoning ordinance now requires conditional-use approval for new data centers). No lawsuit or moratorium against this campus.

What the source record says

Chester, Chesterfield County — first phase of a Blue Owl / Chirisa / PowerHouse JV: initial 50 MW (2025) → 120 MW facility, with a ~1 GW eventual plan (in notes). $600M construction loan closed. Distinct parcel from Google's Midlothian (Chesterfield) campus. Coordinates are the Chester area centroid. The $600M is a construction loan (financing) and the $5B is the multi-site JV total - neither is this campus's capex -> investmentUsd omitted. 800-1,200 jobs projected over 5-7 years spanning construction and operations -> jobs honest-zero. Virginia law bars per-company data-center subsidy disclosure -> subsidy honest-zero. Joint venture with Chirisa Technology Parks and Blue Owl Real Estate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · source-reported under construction

    Blue Owl / Chirisa / PowerHouse JV first phase: initial 50 MW by 2025 expanding to a 120 MW facility (1 GW eventual plan); $600M construction loan closed

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID powerhouse-chirisa-chester-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001133

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Chester, VA · Chesterfield (Approximate location)

Roles

  • Operator: PowerHouse Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2024 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 120 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Dominion Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →