Licensed lead · not independently verified · dcd-dir-001138

PAX — Pennsylvania Digital I

source-reported under construction

PowerHouse Data Centers

Carlisle · Cumberland County · Pennsylvania

Reported planned 1,350 MWSource updated 2 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for PAX — Pennsylvania Digital I.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
PowerHouse Data Centers
Address and locality
Carlisle · Cumberland County · Pennsylvania
Official metro area
Harrisburg-Carlisle, PA
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 1,350 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
2 August 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001138

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
PPL Electric UtilitiesUtility as named by the provider.
Power source
GridProvider label.
Cooling
EvaporativeProvider label.
Land area
700 acres (source-reported; parcel boundary not established)
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
July 2025Provider-reported announcement date.

Provider notes

Energy. PPL Electric Utilities will connect the campuses via a new 500 kV-138 kV switching station; 1.35 GW delivered via the PJM grid. No on-site generation confirmed.

Water. Evaporative cooling for peak thermal conditions. A $14.1M agreement with the Middlesex Township Municipal Authority grants access to up to 400,000 gal/day (0.4 MGD) - a contracted ceiling (~2,367 dwelling units), not measured operational use; regulated by PA DEP and the Susquehanna River Basin Commission.

Community. Middlesex Township supervisors voted 3-0 (Ordinance 3-2025, May 30 2025) to create a 694-acre Data Center Overlay District making data centers a by-right use; Protect Cumberland County PA documents organized opposition over water, pollution, utility rates, and private-well impacts (Rep. Barb Gleim questioned utility-bill effects). No litigation as of 2026-07-08.

What the source record says

'Pennsylvania Digital I' (PAX) in Carlisle, Cumberland County: a ~700-acre, three-campus development delivering 1.35 GW (expandable to 1.8 GW — in notes), each campus with six buildings and a 450 MW substation. The $15B is the project value across all three campuses (in notes). Near-term 300 MW by Q2 2027. Coordinates are the Carlisle area centroid. The $15B figure is the three-campus JV total, not broken out per campus -> investmentUsd omitted. Pennsylvania's data-center sales-tax exemption eligibility is likely but no confirmed award or LERTA designation was found. Partner: Pennsylvania Data Center Partners.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-07 · source-reported under construction

    PA Data Center Partners and PowerHouse launched a $15B JV for a 1.35 GW hyperscale campus (Pennsylvania Digital I / PAX) in Carlisle; near-term 300 MW by Q2 2027

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID powerhouse-pax-carlisle-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001138

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Carlisle, PA · Cumberland (Approximate location)

Roles

  • Operator: PowerHouse Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: July 2025

    Provider-reported announcement date.

  • Status history: 2025-07 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 700 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,350 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: PPL Electric Utilities

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Evaporative

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-02

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →