Licensed lead · not independently verified · dcd-dir-001063

Novva West Jordan Campus

source-reported operational

Novva Data Centers

West Jordan · Salt Lake County · Utah

Capacity not established; source review excludes the published figureSource updated 13 October 2026exact location (provider label) · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Novva West Jordan Campus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Novva Data Centers
Address and locality
West Jordan · Salt Lake County · Utah
Official metro area
Salt Lake City-Murray, UT
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
13 October 2026
Location precision
exact (provider label)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001063
Capacity held out of the public projection.

The provider labels 200 MW operational capacity, while its own energy note identifies 200 MW as substation capacity, not IT load. The mixed capacity object is withheld. The separately stated planned campus and phase figures remain in the cited source review. The upstream row remains attributed below, but this value is not repeated as site capacity.

Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • Source review · reviewed 2026-10-11: Prior source review (2026-10-09): Novva’s March 5, 2025 release states 175 MW of planned campus capacity at completion. Phase 2 and Phase 3 each have a planned 318,000-square-foot building and 72 MW of critical IT load. The release says construction began in December 2023 and January 2024 respectively, and Phase 1 began operating in 2023. It does not establish completion of the later phases. The provider’s 200 MW operational figure is substation capacity in its own energy note, not operating IT capacity; the public structured capacity is withheld. Historical document addendum reviewed 2026-10-11: Utah DAQ's December 19, 2024 Approval Order DAQE-AN160660003-24 identifies Novva SLC Common, LLC as the permittee at 6524 West Old Bingham Highway, West Jordan, Salt Lake County. It supersedes the February 23, 2022 order and describes the existing data center at its stated date. The approved equipment includes 72 natural-gas engines for primary generation for two new buildings and 37 diesel emergency engines, plus eleven 8,000-gallon diesel tanks. The engine counts and ratings are not summed or treated as IT load or utility capacity. The order reclassifies the source as a major CO and HAP source subject to Title V; it does not establish building permits, completion of the new buildings or current permit status after December 2024. West Jordan's March 19, 2025 account describes direct-to-chip cooling and a future one-million-square-foot campus; that description is source-attributed and does not establish an area measure or completion.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
AirProvider label.
Land area
100 acres (source-reported; parcel boundary not established)
Announced investment
$2 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.

Provider notes

Energy. Novva's own facility page describes a centralized 200MW on-campus substation with N+1 redundancy serving the four-phase campus, plus a planned 15MW-30MW of on-site solar. The 175MW figure is the campus's stated total data center capacity at four-phase completion; the 200MW is substation capacity, not IT load.

Water. Novva states the campus uses waterless air-cooled chillers with no evaporative water loss, citing a 1.18 annualized PUE and roughly 394,667 gallons per month (about 4.7 million gallons annually) of total site water use, which it compares to the consumption of 26 homes. Vendor-stated figures, not independently metered.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Power source: On-site gas is described for planned equipment/buildings, while current row energy context identifies an on-campus substation; categorical facility-wide source is not supported.
  • On-site generation: 200 MW is expressly described as substation capacity, not on-site generation.

What the source record says

Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy, for a structural reason rather than a search miss. West Jordan's Redevelopment Agency lists six active project areas, all bounded well east of this campus; under Title 17C an agency may only act within a designated project area, so no participation agreement is available at this location under the current project-area map. The city's own 2025 post on the expansion discusses tax value in generic terms and names no incentive or agreement.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID novva-west-jordan-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Novva Data Centers on its website (captured 29 September 2026)
Name as listed
Utah data center
Address as published
6477 West Wells Park Road, West Jordan, UT

Lifecycle status is not published for this listing.

Utility power: 200 MW. Scope campus · stated as planned. Utility power as stated for this campus. Not critical IT capacity or measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 29 September 2026.

Site area: 100 acres. Scope campus · current or planned not stated. Site area as stated for this campus. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 29 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001063

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • West Jordan, UT · Salt Lake (Exact location)

Roles

  • Operator: Novva Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 100 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $2 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-13

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →