Novva Mesa Data Center Campus

source-reported under construction

Novva Data Centers

Mesa · Maricopa County · Arizona

Reported planned 300 MWSource updated 23 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Novva Mesa Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Novva Data Centers
Address and locality
Mesa · Maricopa County · Arizona
Official metro area
Phoenix-Mesa-Chandler, AZ
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
23 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001061

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Salt River Project (SRP)Utility as named by the provider.
Power source
SolarProvider label.
Cooling
Closed-loopProvider label.
Land area
160 acres (source-reported; parcel boundary not established)
Announced investment
$3 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
200 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
August 2024Provider-reported announcement date.

Provider notes

Energy. 100% renewable energy goal; backup generators designed for second-generation biofuel and HVO

Water. The applicant's filed project narrative describes a closed-loop water cooling system (60% water / 40% glycol), filled once at roughly 200,000 gallons per building, with no evaporative or condensing loss and free cooling below 72°F ambient. Novva's press materials describe the same system as 'water-free air-cooling'; the filed engineering description is the more precise source.

What the source record says

Located near Ellsworth and Warner roads, southeast Mesa. Five data halls, 1.3M sq ft data hall space, 200,000 sq ft office, two-phase buildout over ~10 years. Sixth Novva campus nationally, first in Arizona. Architectural design honors Hohokam heritage. Coordinates approximate. Public-reception check (2026-09-10): Checked Novva's own announcement page (2026-09-10); it markets design amenities ('dedicated acreage offering public pathways for the community') but documents no actual public hearing, resident feedback, or official statement of support/opposition. No community-reception record found in this source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-08 · source-reported proposed

    Novva won 165-acre Mesa state land auction for $62.7M; campus previously filed under name Project Borealis

    Open cited source →

  2. 2025-01 · source-reported under construction

    Construction underway; Phase 1 (96MW critical IT load) targeting late 2026 opening

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID novva-mesa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Novva Data Centers on its website (captured 29 September 2026)
Name as listed
Arizona Data Center
Address as published
Mesa, AZ

Lifecycle status is not published for this listing.

Total power capacity: 300 MW. Scope campus · current or planned not stated. Total power capacity as stated for this campus. Not critical IT capacity, not utility supply, and not measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 29 September 2026.

Site area: 160 acres. Scope campus · current or planned not stated. Site area as stated for this campus. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 29 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001061

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Mesa, AZ · Maricopa (Approximate location)

Roles

  • Operator: Novva Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: August 2024

    Provider-reported announcement date.

  • Status history: 2024-08 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-01 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 160 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Salt River Project (SRP)

    Utility as named by the provider.

  • Power source: Solar

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $3 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 200 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-23

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →