Licensed lead · not independently verified · dcd-dir-001060

Novva Las Vegas Data Center

source-reported operational

Novva Data Centers

6115 Nicco Way · North Las Vegas · Clark County · Nevada · 89115

Reported operational 100 MWSource updated 11 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Novva Las Vegas Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Novva Data Centers
Address and locality
6115 Nicco Way · North Las Vegas · Clark County · Nevada · 89115
Official metro area
Las Vegas-Henderson-North Las Vegas, NV
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
11 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001060

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
NV EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
AirProvider label.
Land area
20 acres (source-reported; parcel boundary not established)
Announced investment
$400 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced
13 September 2022Provider-reported announcement date.

Provider notes

Energy. Renewable energy supply in partnership with NV Energy; wholly owned on-premise 100 MW substation.

Water. Novva describes 'waterless cooling, ambient air cooling' with 5,310 tons of air-cooled capacity and perimeter fan walls (N+1). The 2022 announcement said the water-free design was expected to save approximately 150 to 200 million gallons of water a year.

What the source record says

Building area is stated as 275,000 sq ft in the 2022 announcement and 246,328 sq ft on Novva's current facility page; both figures are left uncollapsed here. Distinct from the operator's separate ~205-acre Apex Industrial Park land position. Coordinates are a street-level OpenStreetMap geocode of Nicco Way.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-11 · source-reported operational

    Novva's facility page presents the site as an operating colocation facility with 24x7 on-site staffing.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID novva-las-vegas-nicco-way-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Novva Data Centers on its website (captured 1 October 2026)
Name as listed
Las Vegas data center
Address as published
6115 Nicco Way, North Las Vegas, NV 89115

Lifecycle status is not published for this listing.

Utility power: 100 MW. Scope campus · current or planned not stated. Utility power as stated for this campus. Not critical IT capacity or measured load. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 1 October 2026.

Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 1 October 2026.

Novva Data Centers · Las Vegas data center — Additional operator-reported details

  • Carrier neutrality: Company states the site is carrier-neutral facility scope

    Company-reported. Not independently verified.

    Open cited source → Captured 2026-10-01.

Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on identical full street address.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001060

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 6115 Nicco Way, North Las Vegas, NV 89115 · Clark (Approximate location)

Roles

  • Operator: Novva Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 13 September 2022

    Provider-reported announcement date.

  • Status history: 2026-09-11 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 20 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: NV Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $400 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-11

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →