Licensed lead · not independently verified · dcd-dir-000948

Meta Prometheus

source-reported under construction

Meta

New Albany · Licking County · Ohio

Reported planned 1,000 MWSource updated 8 August 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Prometheus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
New Albany · Licking County · Ohio
Official metro area
Columbus, OH
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
8 August 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000948

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power supply description
Nuclear PPAs reportedly with Vistra (Ohio plants) and Oklo (Pike County campus); TerraPower PPA reported but not independently confirmed; on-site gas generation referenced in state permit filingsProvider’s own description of the power supply; no separate utility field was supplied.
Power source
MixedProvider label.
Announced investment
$1.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
November 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Ohio Computer Data Center sales-and-use tax exemption (via Meta operating entity Sidecat LLC); reported ~$600M over roughly 40 years · Ohio · 2017 Open cited source →

Provider notes

Energy. Nuclear PPAs with Vistra (Ohio nuclear plants) and Oklo (1.2 GW Pike County campus) reported and partially corroborated by SEC filings and news; TerraPower PPA referenced in NBC4i (403 on access this session) but not found in any independently accessible source — treat as unconfirmed. On-site gas generation mentioned in state permit filings per record notes; 200 MW figure and 20-acre power yard not independently confirmed from accessible public sources and removed from this record.

Community. New Albany City Council granted 15-year property tax abatement; nearby business owners voiced concern over frequent power outages. Broader New Albany data center tax-break policy contested by state legislators.

What the source record says

Baxtel reports campus as partially operational in 2026 with future phases planned; overall 1 GW build-out still in progress. Site address 1500 Beech Rd NW cited in permit filings but not confirmed from independently accessible sources this session. Nuclear PPA claims partially corroborated (Vistra/Oklo via SEC filings and news; TerraPower unconfirmed). On-site gas generation capacity removed pending accessible source confirmation. County listed as Licking — consistent with Beech Road corridor at Licking/Franklin county boundary per stopohiodatacenters.org. OPSB approved a 250 MW behind-the-meter gas plant ("Socrates the Younger," Will-Power OH, LLC) on 109 acres at Clover Valley Rd & Harrison Rd NW, New Albany, with the primary consumer named as Sidecat LLC, a Meta affiliate — corroborating the on-site generation previously removed pending an accessible source, and revising the figure from an unconfirmed 200 MW to 250 MW. This is the plant's nameplate generation, not IT load; the record's capacityMw (1,000 MW planned) is unchanged.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported under construction

    Meta publicly confirms Prometheus at New Albany; described as world's first planned 1 GW data center; expected operational 2026. Baxtel (July 2026) reports some phases already operational with future phases planned — overall 1 GW build-out still under construction.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-prometheus-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000948

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • New Albany, OH · Licking (Exact location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2025-11 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power supply description: Nuclear PPAs reportedly with Vistra (Ohio plants) and Oklo (Pike County campus); TerraPower PPA reported but not independently confirmed; on-site gas generation referenced in state permit filings

    Provider’s own description of the power supply; no separate utility field was supplied.

  • Power source: Mixed

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Ohio Computer Data Center sales-and-use tax exemption (via Meta operating entity Sidecat LLC); reported ~$600M over roughly 40 years · Ohio · 2017

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →