Meta Aiken Data Center

source-reported under construction

Meta

Graniteville · Aiken County · South Carolina

Reported planned 200 MWSource updated 10 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Aiken Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
Graniteville · Aiken County · South Carolina
Official metro area
Augusta-Richmond County, GA-SC
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000924

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Aiken Electric CooperativeUtility as named by the provider.
Power source
MixedProvider label.
Land area
300 acres (source-reported; parcel boundary not established)
Announced investment
$800 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
100 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
August 2024Provider-reported announcement date.

Provider notes

Energy. Meta working with Aiken Electric Cooperative to add new renewable energy to the grid for the facility

Community. Governor Henry McMaster attended groundbreaking. County leaders describe project as one of the largest private investments in Aiken County history. Three-year recruitment process by county.

What the source record says

Sage Mill Industrial Park, Graniteville. 715,000 sq ft; Meta's 22nd US data center. Explicitly optimized for AI workloads. Administration building constructed with mass timber. Expected operational spring 2027. Coordinates are Graniteville area centroid. Subsidies lane checked 2026-09-10: Aiken County offered property-tax breaks to Meta as early as 2023, under the pre-announcement code name 'Project Sabal' and intermediary 'Starskey LLC'. No dollar figure or FILOT ordinance number found this run -- not filing a structured subsidies entry, flagging the lane for a follow-up pass to locate the actual FILOT agreement/ordinance.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-08-30 · source-reported proposed

    Meta publicly announced Aiken County data center campus, 22nd US data center

    Open cited source →

  2. 2024-09 · source-reported under construction

    DPR Construction leading build; Governor McMaster attended groundbreaking ceremony

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-aiken-county-sc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000924

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Graniteville, SC · Aiken (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: August 2024

    Provider-reported announcement date.

  • Status history: 2024-08-30 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2024-09 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 300 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Aiken Electric Cooperative

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $800 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 100 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →