Licensed lead · not independently verified · dcd-dir-000927

Meta Beaver Dam Data Center Campus

source-reported under construction

Meta

County Road A · Beaver Dam · Dodge County · Wisconsin

Reported planned 220 MWSource updated 13 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Beaver Dam Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
County Road A · Beaver Dam · Dodge County · Wisconsin
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 220 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
13 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000927

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Alliant EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
AirProvider label.
Announced investment
$1 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
100 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
November 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Wisconsin sales and use tax exemption for a qualified data center (WEDC certification of Degas LLC, Beaver Dam — County Road A; certified 2/18/2025) · Wisconsin · 2025 Open cited source →

Provider notes

Energy. Meta committed to 100% clean and renewable energy; also investing ~$200M in grid infrastructure upgrades and substations

Water. Dry cooling — no water consumption for cooling once operational; 570 acres of wetland/prairie restoration surrounding facility via Ducks Unlimited partnership

Community. Gov. Evers expressed strong support; some residents raised concerns about water modeling and aquifer impacts

What the source record says

Coordinates are approximate city centroid for Beaver Dam; exact site is Alliant Energy Beaver Dam Commerce Park (Wisconsin's largest certified development-ready site). 700,000+ sq ft campus. Meta's 26th US data center. AI workloads are the stated purpose.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported proposed

    Meta announced $1B data center at Alliant Energy Beaver Dam Commerce Park; Mortenson selected as general contractor

    Open cited source →

  2. 2026-03 · source-reported under construction

    Mortenson leading site grading, foundational work, and infrastructure preparation; completion targeted 2027

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-beaver-dam-wi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Meta on its website (captured 25 September 2026)
Name as listed
Beaver Dam
Address as published
Beaver Dam, WI

Lifecycle status is not published for this listing.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 25 September 2026

Matched to this licensed row on the same specific operator facility page already cited by this record, with independently reviewed subject identity; no new address or boundary is established.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000927

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • County Road A, Beaver Dam, WI · Dodge (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2025-11 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-03 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 220 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Alliant Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 100 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Wisconsin sales and use tax exemption for a qualified data center (WEDC certification of Degas LLC, Beaver Dam — County Road A; certified 2/18/2025) · Wisconsin · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-13

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →