Licensed lead · not independently verified · dcd-dir-000944

Meta Bowling Green (Project Accordion)

source-reported under construction

Meta

Bowling Green · Wood County · Ohio

Capacity not statedSource updated 6 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Bowling Green (Project Accordion).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
Bowling Green · Wood County · Ohio
Official metro area
Toledo, OH
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
6 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000944

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Toledo EdisonUtility as named by the provider.
Power source
MixedProvider label.
On-site generation
350 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Land area
280 acres (source-reported; parcel boundary not established)
Announced investment
$800 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
100 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
April 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

Provider notes

Energy. 100% renewable energy matching committed for grid-drawn power (Toledo Edison/FirstEnergy). Will-Power OH LLC (subsidiary of The Williams Companies) constructing 350 MW Apollo behind-the-meter gas facility adjacent to data center campus; OPSB approved February 3, 2026 (Case No. 25-973-EL-BGN) via fast-track Letter of Notification process — no public hearing held. Plant includes ~120 MW battery energy storage. Not grid-connected. Wood County holds C ozone rating (American Lung Association).

Community. Ohio Power Siting Board fast-tracked approval (Feb 3, 2026) of 350 MW Will-Power Apollo on-site gas plant with no public hearings; residents and environmental advocates raised air quality concerns in Wood County (C ozone rating). Two residences lie within 1,000 feet of planned generating equipment. Plant projected to emit over 2.4 million tons of CO2 annually.

What the source record says

715,000 sq ft facility on State Route 582 between SR-25 and I-75, Middleton Township, Wood County OH. Meta's 28th global and 2nd Ohio data center. The Apollo gas plant (OPSB Case No. 25-973-EL-BGN) operates behind-the-meter serving Liames LLC (Meta shell company); not grid-connected. Full capacity from Apollo expected late 2027. Coordinates are approximate Middleton Township centroid.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023 · source-reported proposed

    Project known locally as Project Accordion via shell company Liames LLC; Fortune 200 company not yet named

  2. 2025-04 · source-reported under construction

    Meta publicly announced April 9, 2025 at Bowling Green State University press conference; construction already underway at announcement; target opening 2027

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-middleton-township-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Meta on its website (captured 25 September 2026)
Name as listed
Bowling Green
Address as published
Bowling Green, OH

Lifecycle status is not published for this listing.

Floor area: 715,000 square feet. Scope campus · stated as planned. Floor area as stated for this campus. Not a different building or campus unless the scope says so. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000944

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Bowling Green, OH · Wood (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: April 2025

    Provider-reported announcement date.

  • Status history: 2023 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-04 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 280 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Toledo Edison

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

  • On-site generation: 350 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Permits, incentives, jobs and proceedings

  • Announced investment: $800 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 100 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Community Reinvestment Area 75% property tax abatement · Wood County, OH · 2023

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-06

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →