Licensed lead · not independently verified · dcd-dir-000943

Meta Mesa Data Center

source-reported operational

Meta

Mesa · Maricopa County · Arizona

Reported operational 50 MWSource updated 31 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Mesa Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
Mesa · Maricopa County · Arizona
Official metro area
Phoenix-Mesa-Chandler, AZ
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 50 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
31 August 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000943

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Salt River Project (SRP)Utility as named by the provider.
Power source
SolarProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
396 acres (source-reported; parcel boundary not established)
Announced investment
$1 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
200 permanent · 2,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2021Provider-reported announcement date.

Provider notes

Energy. Meta partnered with SRP and Ørsted for a portfolio of solar-plus-battery projects to reach 100% renewable for the Mesa data center: majority offtake of the 300 MW Eleven Mile Solar Center (Pinal County), a 50 MW allocation from the 100 MW West Line Solar Facility (Eloy).

Water. Meta has not named the cooling technology for Mesa. Its community development manager for the campus said that 'for more than half the year we can take air from outside to help cool our servers in lieu of continual water use', and that water is recycled several times before discharge to the municipality. The City of Mesa Sustainable Water Service Agreement provides a Water Allowance rising from 550 acre-feet/year at Phase 1 to 1,400 acre-feet/year at Phase 3. Meta's fleet-wide description of newer direct-to-chip closed-loop designs does not apply to this site, which broke ground in 2021.

What the source record says

Meta data center at 3841 S Ellsworth Rd in the Elliot Road Technology Corridor, Mesa, Maricopa County — land acquired 2021 (shell entity 'Redale LLC'), came online in 2025, and was redesigned for AI workloads during construction (baxtel). Meta states 'more than $1 billion' invested in Arizona. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Ellsworth Rd address; a county-parcel pass could upgrade precision to exact.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported operational

    Came online 2025 (land acquired 2021 via 'Redale LLC'); redesigned for AI workloads during construction per baxtel; $1B+ Arizona investment per Meta.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-mesa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000943

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Mesa, AZ · Maricopa (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2021

    Provider-reported announcement date.

  • Status history: 2025 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 396 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 50 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Salt River Project (SRP)

    Utility as named by the provider.

  • Power source: Solar

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced investment: $1 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 200 permanent · 2,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-31

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →