This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Lambda Kansas City AI Supercomputer.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Lambda
- Address and locality
- Kansas City · Platte County · Missouri
- Official metro area
- Kansas City, MO-KS
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 26 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000855
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Evergy
- Power source
- Grid
- Land area
- 16.9 acres (source-reported; parcel boundary not established)
- Announced investment
- $500 million
- AI-use label (provider)
- confirmed
- Announced
- 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Data Center Sales Tax Exemption Program · Missouri · 2025 Open cited source →
Provider notes
Energy. Evergy electricity; Spire natural gas listed as a partner.
What the source record says
11155 N. Airworld Dr (former Bank of America campus, ~16.9 acres), Platte County near KCI airport. Launches early 2026 with 24 MW confirmed; >100 MW is a scale-up ceiling (planned figure). Distinct parcels from Google (Project Mica) and Meta's Kansas City sites. Eligible for the Missouri Data Center Sales Tax Exemption (eligibility only — no award amount confirmed; honest-zero). The >$500M figure is a press estimate (notes). Dedicated to a single unnamed AI customer under a multi-year agreement.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · source-reported under construction
Lambda to build an AI factory at 11155 N. Airworld Dr (former Bank of America campus); launching early 2026 with 24 MW, scaling toward 100+ MW
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- AI cloud firm Lambda targets data center deployment in Kansas City, Missouri · Data Center Dynamics
- Lambda to build a 100MW AI factory in Kansas City, MO · Lambda
- Missouri Department of Economic Development — press release
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID lambda-kansas-city-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- AI Factory in Kansas City
- Address as published
- Kansas City, MO
Lifecycle status is not published for this listing.
Total power capacity: 24 MW.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000855
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Kansas City, MO · Platte (Approximate location)
Roles
- Operator: Lambda
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2025
Provider-reported announcement date.
- Status history: 2025 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 16.9 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Evergy
Utility as named by the provider.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $500 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Data Center Sales Tax Exemption Program · Missouri · 2025
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-26
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.