Google Project Mica

source-reported under construction

Google

Kansas City · Clay County · Missouri

Reported planned 700 MWSource updated 9 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Project Mica.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Google
Address and locality
Kansas City · Clay County · Missouri
Official metro area
Kansas City, MO-KS
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 700 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
9 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000736

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
EvergyUtility as named by the provider.
Power source
GridProvider label.
Land area
493 acres (source-reported; parcel boundary not established)
Announced investment
$10 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
February 2026Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Port KC taxable revenue bond authorization — ceiling $10B (a financing authorization, NOT an abatement value: the city takes title so the property becomes tax-exempt, and the resulting relief is the separate property-tax abatement itemized below) · Kansas City, MO · 2025 Open cited source →
  • 25-year 75% property tax abatement and 100% local/state sales tax exemption on construction materials · Missouri / City of Smithville · 2025 Open cited source →

Provider notes

Energy. Google is Evergy's first customer under its Large Load Power Tariff (approved Nov 2025 by Missouri PSC and Kansas CC); up to ~700 MW to be supplied from Nashua substation and onsite substations at full campus buildout

What the source record says

Five hyperscale data center buildings on 493 acres, northeast of I-435 and US-169 in KC Northland (near Smithville, Clay County). Google committed $1.5M to Smithville School District and $250K to Northland Career Center. Coordinates mark the I-435/US-169 interchange; Port KC places the ~500-acre campus at its northeast corner.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · source-reported proposed

    Google acquires ~493 acres in KC Northland; site originally known as Rocky Branch Creek Technology Park (formerly a QTS/Diode Ventures plan)

  2. 2025-07 · source-reported permitted

    City of Smithville and Port KC approve $10B campus; Google still unconfirmed publicly at this stage

    Open cited source →

  3. 2026-02 · source-reported under construction

    Google confirms Project Mica; construction already underway; first building expected within 18–24 months

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-project-mica-kc-northland-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000736

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Kansas City, MO · Clay (Approximate location)

Roles

  • Operator: Google

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: February 2026

    Provider-reported announcement date.

  • Status history: 2024 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-07 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2026-02 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 493 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 700 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Evergy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $10 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Incentive reported by the source: Port KC taxable revenue bond authorization — ceiling $10B (a financing authorization, NOT an abatement value: the city takes title so the property becomes tax-exempt, and the resulting relief is the separate property-tax abatement itemized below) · Kansas City, MO · 2025

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: 25-year 75% property tax abatement and 100% local/state sales tax exemption on construction materials · Missouri / City of Smithville · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →