This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for CyrusOne CIN2 (Cincinnati).
Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CyrusOne
- Address and locality
- 209-229 West 7th Street · Cincinnati · Hamilton County · Ohio · 45202
- Official metro area
- Cincinnati, OH-KY-IN
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 14 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- exact (provider label)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000362
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Cooling
- Closed-loop
- AI-use label (provider)
- mixed use
What the source record says
Cincinnati's primary carrier-hotel / switching facility (originally a Cincinnati Bell data-center carve-out), 143,778 sq ft of technical space, HPC-capable, closed-loop chilled-water cooling. Address and 14 MW confirmed on CyrusOne's own site; the building is independently tagged CyrusOne CIN2 in OpenStreetMap. Distinct from the already-tracked CyrusOne CIN3 in Mason (Warren County).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- CyrusOne Cincinnati facility page: address, 14 MW, 143,778 sq ft technical space, closed-loop chilled-water cooling · CyrusOne
- DataCenterMap listing corroborating CyrusOne CIN2 (7th Street carrier hotel) · DataCenterMap
- PeeringDB 'CyrusOne Cincinnati 7th St', 209-229 West 7th St, Cincinnati 45202 (coordinates match this record) · PeeringDB
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cyrusone-cin2-cincinnati-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000362
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): mixed use
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 209-229 West 7th Street, Cincinnati, OH 45202 · Hamilton (Exact location)
Roles
- Operator: CyrusOne
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
Power capacity
- Reported capacity: Operational: 14 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.