AWS Project Green Campus

source-reported under construction

Amazon Web Services

New Florence · Montgomery County · Missouri

Capacity not statedSource updated 7 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AWS Project Green Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Amazon Web Services
Address and locality
New Florence · Montgomery County · Missouri
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
7 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000141

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Ameren MissouriUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedProvider label: unknown.
Land area
1,000 acres (source-reported; parcel boundary not established)
Announced investment
$10 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
2026Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Montgomery County Chapter 100 bond / PILOT — personal property tax abatements on declining schedule approved December 2025; real property taxes paid in full; public safety districts (ambulance, fire) opted out and retain full allocations. Total multi-year abatement value not publicly disclosed. · Montgomery County, MO · 2025 Open cited source →

Provider notes

Energy. Powered by Ameren Missouri grid. AWS committed to working with Ameren to ensure project energy costs are not passed to other ratepayers. AWS announced a separate 138MW renewable energy project in Missouri (not confirmed as on-site or dedicated to this campus).

Water. Water sourced from Cambrian-Ordovician aquifer via wells drilled to ~1,500 ft depth (to avoid impacting local private wells at shallower depths). Initial phase projected at 2.9M gallons/year; full 17-building campus projected at ~50M gallons/year (~0.137 MGD equivalent). Regional aquifer capacity exceeds 23 trillion gallons; current regional utilization ~8%; this project adds ~0.03%. On-site stormwater management ponds and water treatment plant planned. Cooling methodology not publicly specified.

Community. Preserve Montgomery County LLC (coalition of local residents, farmers, and business owners) filed a 10-count lawsuit in February 2026 alleging Missouri Sunshine Law violations — specifically that county commissioners conducted negotiations in closed sessions and signed NDAs with Amazon. Community concerns at public meetings included water usage impacts, potential electric rate increases, and loss of rural character. Some residents and officials expressed support for the project's economic benefits. Construction proceeded despite the pending suit. …

What the source record says

Codename 'Project Green'; application filed via NorthPoint Development, LLC. Two-phase build-out: Phase 1 = 8 data center buildings; Phase 2 = 13 additional buildings (21 total). Located on ~1,000 acres at northeast quadrant of I-70 and Highway 19 interchange near New Florence. Official AWS/Governor Kehoe announcement on June 15, 2026 cited a $10B investment commitment. Earlier county planning documents and initial filings referenced a maximum capital investment ceiling of up to $35B — that figure is a speculative ceiling, not a committed amount. AWS separately announced a 138MW renewable energy project in Missouri; not confirmed as dedicated to this campus. Community investments included in announcement: $3M for county 911/emergency dispatch upgrades, $3M for community programs, $1M for Montgomery County Fairgrounds, $150K community fund, $50K teacher grant. Preserve Montgomery County LLC filed suit in February 2026 alleging ten counts of Missouri Sunshine Law violations (closed-session negotiations, NDAs with Amazon); case pending as of mid-2026. First buildings targeted operational by 2027; full campus potentially complete ~2032. Coordinates are approximate (parcel centroid at I-70 / Hwy 19 NE quadrant). Jobs: KOMU reported ~400 permanent jobs; DCD's coverage of the same $10B announcement cited no specific permanent figure (only 'thousands of construction jobs') — permanent count left unstructured pending firm corroboration.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported proposed

    Application filed via NorthPoint Development, LLC for a 1,000-acre parcel at the northeast quadrant of I-70 and Highway 19 interchange near New Florence; two-phase campus of up to 21 data center buildings.

    Open cited source →

  2. 2025-12 · source-reported permitted

    Montgomery County Commission unanimously approved the project and tax abatement incentive framework in December 2025; public safety entities (ambulance district, fire protection district) opted out of Chapter 100 participation and retained full tax allocations.

    Open cited source →

  3. 2026-04 · source-reported under construction

    Construction under way by April 2026; Preserve Montgomery County LLC lawsuit filed in February 2026 pending. Governor Kehoe and AWS made the official public $10B investment announcement on June 15, 2026.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-green-new-florence-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000141

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • New Florence, MO · Montgomery (Approximate location)

Roles

  • Operator: Amazon Web Services

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2026

    Provider-reported announcement date.

  • Status history: 2025 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-12 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2026-04 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 1,000 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Ameren Missouri

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    Provider label: unknown.

Permits, incentives, jobs and proceedings

  • Announced investment: $10 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Montgomery County Chapter 100 bond / PILOT — personal property tax abatements on declining schedule approved December 2025; real property taxes paid in full; public safety districts (ambulance, fire) opted out and retain full allocations. Total multi-year abatement value not publicly disclosed. · Montgomery County, MO · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-07

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →