This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Amazon Devlin Technology Park.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Bristow · Prince William County · Virginia
- Official metro area
- Washington-Arlington-Alexandria, DC-VA-MD-WV
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 6 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000063
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 188.5 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: contested
- AI-use label (provider)
- mixed use
- Announced
- November 2025
Provider notes
Community. Bristow residents organized and challenged rezoning in court unsuccessfully. Site is adjacent to schools and homes. County is currently weighing whether to remove the data center overlay district entirely.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: The source note identifies the amount as a land purchase price, not the data center investment.
What the source record says
$700M land purchase is among the highest ever for undeveloped land in the US. Zoning allows up to 3.5 million sq ft of data center space and three substations. Adjacent to Microsoft's Bristow campus parcel. Coordinates approximate for northwest corner of Devlin and Linton Hall roads.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2022-01 · source-reported proposed
Stanley Martin Homes assembled 270-acre site and applied for rezoning for up to 3.5 million sq ft of data center use
- 2023-11 · source-reported permitted
County Board approved rezoning; circuit court upheld 2024; Virginia Court of Appeals upheld September 2025. Amazon purchased 188.5 acres (70% of park) from Stanley Martin for $700M on November 5, 2025.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Amazon buys 189 acres in Prince William tech park for $700M · Virginia Business
- Amazon pays $700M for planned data center site in Virginia's Prince William County · Data Center Dynamics
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID amazon-devlin-tech-park-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000063
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): mixed use
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Bristow, VA · Prince William (Approximate location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: November 2025
Provider-reported announcement date.
- Status history: 2022-01 · source-reported proposed
Status history supplied by the source.
- Status history: 2023-11 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 188.5 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-06
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.