Licensed lead · not independently verified · dcd-dir-000964

Microsoft Bristow Data Center Campus (MNZ03)

source-reported operational

Microsoft

Bristow · Prince William County · Virginia

Capacity not statedSource updated 17 July 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Microsoft Bristow Data Center Campus (MNZ03).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Microsoft
Address and locality
Bristow · Prince William County · Virginia
Official metro area
Washington-Arlington-Alexandria, DC-VA-MD-WV
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
17 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000964

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Dominion Energy VirginiaUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
83 acres (source-reported; parcel boundary not established)
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.
Announced
2021Provider-reported announcement date.

Provider notes

Energy. Grid-served by Dominion Energy Virginia (per an interconnection tracker); no on-site generation is reported.

Water. MNZ03 became operational around the 2024–25 transition in Microsoft's cooling standard (from evaporative-assist to closed-loop, zero-water evaporation for new designs), and the specific system installed here is unconfirmed. Microsoft reported reaching corporate 'water-positive' status in FY2025.

Community. MNZ03 was built by-right on the former Atlantic Research rocket-testing site (existing heavy-industrial zoning within the county's data-center overlay), so it required no rezoning and faced no site-specific hearing. But it sits at the epicenter of Prince William County's data-center opposition — supervisors denied a nearby data center 4–2 in Sept 2025, residents sued over an adjacent rezoning, and the county is moving to end the overlay district. Microsoft is eligible for Virginia's data-center sales-and-use tax exemption, but state law bars disclosure of recipients and amounts.

What the source record says

Microsoft does not publicly disclose data center locations; sourced from public property records and third-party tracking databases. 8008 Devlin Road, Bristow. Adjacent to Amazon's Devlin Technology Park parcel and within Prince William County's Data Center Opportunity Zone Overlay District. Coordinates approximate. Status updated to operational per Baxtel (year built 2025); datacentermap.com returned HTTP 429 during fact-check and could not be independently read.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021-01 · source-reported proposed

    Microsoft acquired 83 acres at 8008 Devlin Road for $83.84M and an adjacent 9.6-acre parcel; multi-phase campus planned, first building (MNZ03) to comprise 250,000 sq ft over three stories

    Open cited source →

  2. 2025 · source-reported operational

    MNZ03 reported as operational per Baxtel third-party tracking database; year built listed as 2025; described as fully operational Azure facility

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID microsoft-bristow-mnz03-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000964

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Bristow, VA · Prince William (Approximate location)

Roles

  • Operator: Microsoft

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2021

    Provider-reported announcement date.

  • Status history: 2021-01 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 83 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Dominion Energy Virginia

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-17

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →