This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Shippingport Industrial Park.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Aligned Data Centers
- Address and locality
- Shippingport · Beaver County · Pennsylvania
- Official metro area
- Pittsburgh, PA
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 2,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 25 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000051
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- On-site gas
- Cooling
- Closed-loop
- Land area
- 660 acres (source-reported; parcel boundary not established)
- Announced investment
- $10 billion
- Announced jobs
- 640 permanent · 3,000 construction
- Community response
- Provider label: mixed
Provider notes
Energy. Site plan for 'Project Phoenix' includes a 70-acre natural gas power generation pad serving the campus; roughly 400 of the 593 acres would be graded. A campus MW figure was not disclosed in this source.
Water. Aligned states zero-water operational cooling via a closed-loop recycling system; the campus is pursuing Green Globes certification.
Community. Local officials and Pennsylvania Gov. Josh Shapiro have criticized the pace and secrecy of the Shippingport-area data center buildout, and community groups have organized against nearby proposed data centers citing noise and environmental concerns; a nonprofit (Environmental Health Project) op-ed warned of health and financial burdens. A Shippingport resident and the Beaver County Corporation for Economic Development president voiced support/openness to the project (with caveats about energy costs), and reporting noted comparatively little organized public opposition to date.
What the source record says
Two natural-gas-powered buildings in a 660-acre industrial park; construction potentially starting later 2026.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · source-reported proposed
- 2026-08-17 · source-reported permitted
Conditional use largely granted. On January 28, 2026 Shippingport Borough Council approved most of Aligned's conditional use permit and related modifications for the campus ('Project Phoenix') — three data center buildings of 672,924, 638,000 and 638,000 sq ft plus a 147,000 sq ft warehouse/office building, on a 593-acre site of which roughly 400 acres would be graded, alongside a 70-acre natural gas power generation pad. Requested variances covered building height (45 ft to ~65 ft), clearing up to 75% of woodland, 24-hour construction noise, and a 65 dB noise limit measured at the nearest residence. PARTIAL: two noise-related items remain to be voted on, and mass grading, NPDES, stormwater and emergency management permits are filed but not yet issued.
- 2026-09-12 · source-reported under construction
Aligned Data Centers broke ground on the 2 GW 'Project Phoenix' campus in Shippingport on September 10, 2026, moving the site from permitted to under construction.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Shippingport Industrial Park data center campus · Data Center Dynamics
- Data Centers? Beaver County Can't Seem to Get Enough of Them · Beaver County Business
- Beaver Valley could become center of AI infrastructure for region · CBS Pittsburgh
- Beaver Valley becomes data center target (Post-Gazette reprint, byline Anya Litvak and Chloe Jad, Feb 8 2026) · Pittsburgh Post-Gazette (via Three Mile Island Alert reprint)
- Shippingport data centers will be financial, health burdens on Beaver County residents · TribLive (community op-ed by Elan Justice Pavlinich, Environmental Health Project)
- Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW "Project Phoenix" Campus · Aligned Data Centers (GlobeNewswire)
- Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver County · Marcellus Drilling News
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aligned-shippingport-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000051
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Shippingport, PA · Beaver (Approximate location)
Roles
- Operator: Aligned Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-08-17 · source-reported permitted
Status history supplied by the source.
- Status history: 2026-09-12 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 660 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 2,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: On-site gas
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $10 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 640 permanent · 3,000 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-25
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.