Licensed lead · not independently verified · dcd-dir-000034

Aligned Data Centers – Conesville Industrial Park

source-reported under construction

Aligned Data Centers

Conesville · Coshocton County · Ohio

Capacity not established; source review excludes the published figureSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Aligned Data Centers – Conesville Industrial Park.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Aligned Data Centers
Address and locality
Conesville · Coshocton County · Ohio
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
9 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000034
Capacity held out of the public projection.

The source note states that capacity MW has not been publicly disclosed, so the stored planned figure is not repeated. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
AEP Ohio (PJM interconnect)Utility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedProvider label: unknown.
Land area
197 acres (source-reported; parcel boundary not established)
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2025Provider-reported announcement date.

Provider notes

Energy. Site is in AEP Ohio service territory. Brownfield location retains former plant's high-capacity grid infrastructure, which is a primary site-selection advantage. Aligned is publicly exploring on-site SMR/nuclear additions but no confirmed agreement. Nuclear would be future supplemental supply.

Water. No cooling type or water consumption data disclosed. Former coal plant had access to Muskingum River cooling water infrastructure; Aligned has not confirmed whether this will be utilized.

Community. Strong positive reception at October 2025 groundbreaking. Coshocton County Commissioners and Port Authority executive director spoke favorably. Site revitalization fills a significant local tax and employment gap left by AEP plant closure (plant formerly provided ~10% of River View Local Schools' annual budget and employed ~600 workers). …

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Announced permanent jobs: The source note says permanent and construction jobs were described only as ‘hundreds’ and ‘thousands’ and that the numeric job fields were meant to be omitted as projections.
  • Announced construction jobs: The source note says permanent and construction jobs were described only as ‘hundreds’ and ‘thousands’ and that the numeric job fields were meant to be omitted as projections.

What the source record says

Brownfield redevelopment of former AEP Conesville coal plant (2 GW, operational 62 years, closed May 2020). Frontier Group of Companies acquired the plant in 2020 and built the Conesville Industrial Park across ~2,500 acres; Aligned purchased a 197-acre parcel. Aligned describes the project as 'AI/HPC' and 'Gigascale' in its press materials, and this is its third Ohio campus (others: Perkins Township/Sandusky, 96 MW total; Pataskala). Multi-building campus — renderings show up to four buildings; second, third, and fourth buildings referenced at groundbreaking. Capacity MW not publicly disclosed. Investment described as 'multi-billion dollar' — no firm figure confirmed; field omitted per policy. Construction jobs described as 'thousands'; permanent roles as 'hundreds of high-quality long-term positions' — projections only, numeric fields omitted. Aligned is exploring on-site nuclear power (SMRs) for this campus and nearby Zanesville/Cambridge sites; no agreement confirmed. Coordinates approximate (village-level). Site infrastructure funding note: the Coshocton Port Authority received a $58.7M grant (Ohio Dept of Development All Ohio Future Fund, announced July 21, 2025) for utility upgrades, water/wastewater extensions, and roadway improvements across the broader industrial park — this benefits Aligned indirectly but is not a direct subsidy to Aligned and is therefore not listed under subsidies.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-07-24 · source-reported proposed

    Aligned press release; 197-acre campus at Conesville Industrial Park, foundational customer secured, initial delivery mid-2026

    Open cited source →

  2. 2025-10-11 · source-reported under construction

    Groundbreaking ceremony held at Conesville Industrial Park

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aligned-conesville-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000034

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Conesville, OH · Coshocton (Approximate location)

Roles

  • Operator: Aligned Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2025

    Provider-reported announcement date.

  • Status history: 2025-07-24 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-10-11 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 197 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: AEP Ohio (PJM interconnect)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    Provider label: unknown.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →