Licensed lead · not independently verified · dcd-dir-000033

Aligned Coal City Campus

source-reported proposed

Aligned Data Centers

Coal City · Grundy County · Illinois

Capacity not statedSource updated 12 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Aligned Coal City Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Aligned Data Centers
Address and locality
Coal City · Grundy County · Illinois
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
12 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000033

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ComEdUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Reported water use
0.0415 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Land area
305 acres (source-reported; parcel boundary not established)
Announced jobs
300 permanent · 2,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
25 November 2024Provider-reported announcement date.

Provider notes

Energy. Developer-funded substation and switchyard connecting directly to the regional transmission system, described as at no cost to ratepayers.

Water. Air-cooled heat rejection with a sealed closed-loop water circuit; projected water use roughly 41,500 gallons per day.

Community. Local coverage reports pushback over proximity to residential zones, Coal City Middle School and the Early Childhood Center; a Change.org petition opposes the campus. Aligned held a public open house on 5 August 2026.

What the source record says

Roughly 305 acres in the Coal City industrial park near the southeast corner of Reed and Carbon Hill Roads, with Aligned Data Centers (Acquisition) PropCo, LLC as operator and The Reed Group, LLC as the local landowner/developer. Investment is described only as 'multi-billions of dollars' by the developer, so no figure is recorded. Distinct from the three tracked Aligned ORD buildings in Northlake and Elk Grove Village.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-12 · source-reported proposed

    Village Board adopted non-binding TIF inducement resolutions 26-09 and 26-10 on 24 June 2026; no TIF district, redevelopment agreement or zoning approval has been granted.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aligned-coal-city-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000033

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Coal City, IL · Grundy (Approximate location)

Roles

  • Operator: Aligned Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 25 November 2024

    Provider-reported announcement date.

  • Status history: 2026-09-12 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 305 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ComEd

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

  • Reported water use: 0.0415 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Permits, incentives, jobs and proceedings

  • Announced jobs: 300 permanent · 2,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →