Licensed lead · not independently verified · dcd-dir-000035

Aligned Data Centers Amber Site (Grady County)

source-reported proposed

Aligned Data Centers

Amber · Grady County · Oklahoma

Capacity not statedSource updated 14 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Aligned Data Centers Amber Site (Grady County).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Aligned Data Centers
Address and locality
Amber · Grady County · Oklahoma
Official metro area
Oklahoma City, OK
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000035

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Land area
800 acres (source-reported; parcel boundary not established)
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
September 2026Provider-reported announcement date.

Provider notes

Water. Aligned states its facilities employ "a closed-loop cooling system designed to minimize water use." This is the operator's general design claim, not a site-specific permit or measurement.

Community. Neighboring landowners raised concerns about water supply, electricity demand, roads and infrastructure, noise, lighting, agriculture and nearby rural property. The Grady County Board of Commissioners called a special meeting for Sept 8, 2026 to consider county response options. Grady County officials have separately said the county cannot impose a data center moratorium.

What the source record says

An affiliate of Aligned Data Centers bought roughly 800 acres of rural land near Amber, northwest of Chickasha in Grady County, for more than $17 million. That $17M is the LAND purchase price only — it is not a project investment figure and is deliberately not recorded as investmentUsd. No capacity, building count or timeline has been made public. Coordinates are the town of Amber, not a parcel. This is a separate Grady County site from the tracked Chickasha Airport Industrial Park project.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-02 · source-reported proposed

    Land purchase near Amber surfaced publicly; Aligned says the project remains in early stages with many details unfinalized.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aligned-data-centers-amber-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000035

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Amber, OK · Grady (Approximate location)

Roles

  • Operator: Aligned Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: September 2026

    Provider-reported announcement date.

  • Status history: 2026-09-02 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 800 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →