Latest updates · 4 dated events · Newest log entry: 21 September 2026
Permits: dated data center events
Permits issued, modified or expired by an agency. A permit is permission, not construction or operation.
About these streams
Three different things, kept apart. Facility and project events happened in the world on the date the source gives. Evidence updates are DataCenterData publishing records; they are not events at a facility. Corrections to what DataCenterData published live in the corrections history, the corrections authority.
No reviewed milestones match these filters. This does not establish that no activity occurred.
Events, newest event date first
Permit issuedOfficial recordVirginia
Botetourt County permit issued in August 2026: Google Data Center Campus — Botetourt Center at Greenfield (VA) — land disturbance permit for Mass Grading Package No. 1 (phased grading)
Botetourt County reported that Google had received a County Land Disturbance Permit, after the County completed review of Mass Grading Package No. 1, allowing phased grading on its 312-acre site in the Botetourt Center at Greenfield.
- Organization named in the record
- Botetourt County
- Not established by this event
- start of grading or construction; building permits; state or federal environmental permits; completion, energization or operation.
- Event date
- Source dated
- Added to Latest updates
Record: Google Data Center Campus — Botetourt Center at GreenfieldProject timeline: recorded eventsSource: Grading to Begin for Google Data Center ProjectArchived copy
Permit issuedOfficial recordWashington
Washington Ecology permit 26AQ-E016 issued on 6 April 2026: Intergate Quincy — Sabey Data Center Properties (Quincy, WA) — approval order adding 13 emergency generators for Building E
Washington Ecology issued Notice of Construction Approval Order 26AQ-E016 on April 6, 2026 to Intergate Quincy – Sabey Data Center Properties, approving 13 additional emergency generators for Building E at the existing data center at 2200 M Street NE, Quincy.
- Organization named in the record
- Washington Ecology
- Not established by this event
- Installation or operation of the added generators; Building E completion or operation; IT capacity (generator MWe is not IT load).
- Event date
- Source dated
- Added to Latest updates
Record: Intergate Quincy — Sabey Data Center PropertiesProject timeline: recorded eventsSource: Notice of Construction Approval Order No. 26AQ-E016 and Technical Support Document — Intergate Quincy – Sabey Data Center PropertiesArchived copy
Permit issuedOfficial recordMaryland
Maryland Department of the Environment permit issued on 25 March 2026: Amazon Data Services BWI-150–BWI-153 Campus (MD) — construction permit (control no. B-08076) for 99 diesel emergency generators at BWI-150 to BWI-153
The Maryland Department of the Environment issued a Construction Permit (Control No. B-08076) to Amazon Data Services, Inc. for BWI-150 through BWI-153 at 3250 Digital Drive, Frederick, covering 99 diesel-fired emergency generators.
- Organization named in the record
- Maryland Department of the Environment
- Not established by this event
- construction of the data-center buildings; generator installation or operation; facility operation or energization.
- Event date
- Source dated
- Added to Latest updates
Record: Amazon Data Services BWI-150–BWI-153 CampusProject timeline: recorded eventsSource: MDE Permit to Construct — Amazon Data Services, Inc., BWI-150 through BWI-153 (Control No. B-08076)Archived copy
Permit issuedOfficial recordWashington
Washington Ecology permit 26AQ-E008 issued on 22 January 2026: CyrusOne — Quincy Data Center (Quincy, WA) — revised approval order cutting permitted emergency generators from 42 to 22
Washington Ecology issued Notice of Construction Approval Order 26AQ-E008 on January 22, 2026 to CyrusOne LLC for its existing Quincy data center at 1025 D Street NW, reducing the facility's permitted emergency generators from 42 to 22 and revising the permit's conditions.
- Organization named in the record
- Washington Ecology
- Not established by this event
- Any change in IT capacity or operating status; Closure or downsizing of IT load (a generator-count reduction is not a capacity statement).
- Event date
- Source dated
- Added to Latest updates
Record: CyrusOne — Quincy Data CenterProject timeline: recorded eventsSource: Notice of Construction Approval Order No. 26AQ-E008, Technical Support Document and Response to Comments — CyrusOne QuincyArchived copy
How to read the dates
- Event date
- When the permit, filing, approval or other event happened, as the source states it. A month or year is shown when the source gives no day.
- Source dated
- The date printed on the source document (minutes, order, permit record or company statement). It can be later than the event.
- Source accessed
- When DataCenterData retrieved the source. Shown on each event page.
- Added to Latest updates
- When the entry entered this updates log. It is a publishing date, not an event date. An event may already have appeared elsewhere on DataCenterData, for example in the corrections history.