Georgia index · last changed 3 November 2026

Georgia data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Georgia data centers.

7 sourced policy records for Georgia ↓Facility register: 120 records · by county →8 published DataCenterData records · evidence status shown per row77 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Georgia

Map, listings and checked facts.

Start with 77 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Georgia map

Reported locations in Georgia

77 licensed rows · 44 source localities · 5 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 134 data-center source listings here across licensed, operator and DataCenterData layers (91 with a map point); 142 with government registry records. Source listings are not distinct sites.5 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 5 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

77 licensed rows44 reported city labels49 eligible organization labels

Browse all 77 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported permittedReported planned 18 MWSource updated 10 September 2026approximate location
  2. source-reported proposedCapacity not statedSource updated 14 October 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

37 operator-listed sites (mixed units; not added to licensed rows) in Georgia →

23 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Georgia evidence at a glance

Some questions answerable

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
8
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
77 not independently verified
Capacity boundary stated
0 of 8 published DataCenterData rows
Review timing
Audit through 17 September 2026 · next 2 January 2027
Known coverage gap

Neither DOR document names a recipient, so no exemption certificate holder could be identified.

Browse all 77 Georgia licensed leads → · Why these counts differ →

Projects

8 project records. Names are as they appear on each record page.

Projects published for Georgia
Record / rolesStatusCapacity / scalePrimary evidence
Microsoft Tyrone Data Center Project approvedproject UnknownNo independently supported figureNo primary-source critical IT, utility-service, generation or measured-load figure was established. Microsoft Data Center Project Information — Town of Tyrone →Gov. record
Project CamelliaDeveloper: Octans GA LLC c/o Butler Snow · Owner: Effingham County Industrial Development Authority proposedproject · Georgia DRI 4801; initial information filed 22 July 2026; regional-review status is not project lifecycle status. UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record
Project SailDeveloper: Atlas Development, LLC · Owner: William Gause; AKJJ Holdings; Billy & Brenda Harper approvedproject · Coweta County Board of Commissioners minutes of 7 April 2026; rezoning decision only. UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record
QTS - BlakelyDeveloper: QTS Technology Services, LLC · Owner: McKnight Blakely LLC proposedproject · Georgia DRI 4651; initial form filed 10 March 2026; additional form recorded 16 September 2026. UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record
Kingston Technology HubDeveloper: Thor Acquisition WC LLC · Owner: Robert C. Cha, Silvana U. Cha, Christine Cha Choe, and Christopher H. Choe proposedproject · Georgia DRI 4835; initial form filed 4 September 2026; proposal and regional-review records only. UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record
ATL2 EastDeveloper: QTS Eastwood, LLC approvedproject · City of Fayetteville Ordinance 25-O-34 adopted 18 December 2025 (rezoning). Zoning approval only — not construction or operation. UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record
ATL50Developer: Microsoft proposedproject · Georgia Department of Community Affairs (DCA); Initial DRI Information Form, DRI #4843, 'Brief Description of Project'; action requested checkbox = Permit; 'other action' = Masterplan Review; document date 2026-09-15 UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record
Gregory Road Data CenterDeveloper: John B. Williams · Owner: Multiple ownership, including developer & others: JBW Investments, LLC; JF Land Investments, LLC; Tide Investments, LLC; FW Johansen Investments, LLC; James Moss, LLC; and John B. Williams & Alyce Toonk. proposedproject · Lifecycle remains 'proposed': DRI process status 'Completed' is the state review process closing, not local approval, construction or operation.
Full status noteGeorgia Department of Community Affairs (DCA); Initial DRI Information Form, DRI #4428, 'Brief Description of Project'; requested actions = Rezoning and, under 'Other', 'Annexation'; document date 2025-03-27. Newton County Board of Commissioners Resolution R050625, adopted 2025-05-06, objects to the annexation application under O.C.G.A. § 36-36-113. Lifecycle remains 'proposed': DRI process status 'Completed' is the state review process closing, not local approval, construction or operation.
UnknownNo independently supported figure Georgia Department of Community Affairs (DCA) →Gov. record

Where the records were checked

Statewide audit pending

Enough to answer questions

This is still not a list of every data center in the state.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 17 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 2 January 2027.

8 independently source-linked project/campus records; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

  • Economic development incentives — Checked
    • Neither DOR document names a recipient, so no exemption certificate holder could be identified.
    • The earlier (pre-May 9 2022) county table linked on the same page was not yet reviewed directly.
    • A statewide DRI keyword sweep of every data-center row was not published; selected DRI initial forms and summaries were later opened for Project Camellia, Project Sail, QTS - Blakely and Kingston Technology Hub.

    Selected records

  • Utility commission and large-load records — Partly checked
    • No searchable Georgia PSC docket URL was exposed, so docket 44280's full filing list and any Georgia Power IRP or large-load report were not enumerated.
    • The order PDFs could not be read (image-only scans, no OCR performed), so nothing is quoted from the orders themselves.
    • Georgia Power's Integrated Resource Plan, its large-load queue reporting and any electric service agreements were not retrieved; no research lead has a utility_request_mw figure.
    • Several research leads are described as having applied to Georgia Power for specific loads (for example a 99 MW maximum at Statesboro and a 288 MW grid connection at Cartersville); none of those applications was located.

    Selected records

  • Environmental and construction permits — Partly checked
    • GEOS was unavailable during review; no Georgia air permit application or issued permit was retrieved.
    • The Georgia EPD air-quality permit reported issued for Serverfarm on 2026-06-29 and the 2026-07-02 Notices of Violation were not retrieved from EPD.
    • The Georgia EPD reference SAS-2024-00075 associated with the DC BLOX Rockdale campus was not retrieved and is recorded only as a note.
    • No water withdrawal, stormwater or county land-disturbance permit was searched for any research lead.

    Selected records

  • Local planning, assessor and map records — Partly checked
    • Effingham County's Project Camellia page did not respond during review twice; the bounded public record now rests on the Georgia DRI filing rather than that county page.
    • Coweta County's zoning case system was not reached, so Project Peach, Project Oak and Bridgeport still have no county record; Project Sail's rezoning decision is recorded from the Board of Commissioners' minutes of 7 April 2026.
    • No Bartow, Spalding, Douglas, Newton, Floyd, Carroll, Fulton, Rockdale, Richmond, Columbia, Hall, Muscogee, Troup, Early, Bulloch, Clayton or Cobb agenda, minutes or zoning file was retrieved; selected Georgia DRI filings were later opened for Kingston Technology Hub and QTS - Blakely.
    • Only one Georgia assessor or GIS parcel record was queried, so 68 of 70 research leads carry no parcel identifier.
    • the broad discovery sweep remains incomplete for Georgia, so remaining county portals could only be reached by guessing URLs.

    Selected records

  • Tax abatements and development agreements — Partly checked
    • No Georgia development authority agreement, bond resolution or superior court validation order was retrieved; the Clayton County award is documented only through a news account.
    • The Fayette County Development Authority incentives page could not be retrieved during review.
    • The $1.2 billion Integra SPV equipment-bond validation reported for CoreWeave Dalton II in June 2026 was not obtained, so the research lead has no agreement in evidence.
    • The Town of Tyrone record affirmatively states no abatement was requested or offered there, which is the only abatement fact confirmed from a government source in the current research record.

    Selected records

  • Operator disclosures — Checked
    • DC BLOX's Rockdale page could not be retrieved and T5's Atlanta IV page was unavailable, so the 154 critical IT MW and 200 MW phase-one figures noted by the dataset are not recorded.
    • Microsoft, QTS, Switch, STACK, CoreSite, Digital Realty, Flexential, Aligned, Edged, Vantage, DataBank, Northern Data, Prologis, CyrusOne and Serverfarm pages were not individually read.
    • Oracle and Apple disclosures were not checked for Georgia at all.
    • Amazon's release gives no site, acreage or capacity for either Georgia county.

    Selected records

  • Open datasets and directories — Checked
    • Compute Atlas source URLs were followed only for the Whitfield parcel, the SELC letter, the Clayton and Coweta news items and the operator pages; most of its press links were not yet reviewed directly.
    • The dataset notes a QTS Atlanta DC2 building record that is not in this state extract and therefore is not a research lead here.
    • No unlicensed directory was used, so Georgia facilities absent from Compute Atlas — smaller colocation sites in particular — are missing.

    Selected records

  • Closures, withdrawals and former names — Checked
    • No county or city record of any Georgia withdrawal or denial was retrieved; both documented ones rest on news accounts.
    • A report that the Temple / Project Bus developer pulled its proposal appears in the dataset's own source list but was never opened, leaving an unverified lead's status in conflict.
    • Older Georgia closures, demolitions and acquisitions before 2024 were not searched.
    • Newton County and Floyd County data center moratoriums referenced in the dataset's sources were not retrieved.

    Selected records

  • News and other discovery — Partly checked
    • Only one background article was read; the large volume of Georgia data center reporting seen in dataset source lists was not yet reviewed directly.
    • Advocacy and research trackers other than the SELC enforcement letter were not consulted.

    Selected records

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Alpharetta, Atlanta, Augusta, Cartersville, Columbus, Covington, Douglasville, Griffin, Lithia Springs, Marietta, Rome, Social Circle. Their listings above are source listings to investigate. No statewide evidence answer is published for Georgia either; statewide rules are under Policy tracker below.

1 Georgia answer is not tied to a published record, so it is not placed here: Georgia answers.

Policy tracker

Georgia policy records

7 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 4 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Local construction moratorium · DeKalb County (unincorporated) only (local rule)

DeKalb County (unincorporated): data center application moratorium extended to 30 March 2027

In effect · Unincorporated DeKalb County, Georgia · Local

Effective: 7 July 2026

Issuing authority: DeKalb County Board of Commissioners

On 7 July 2026 the DeKalb County Board of Commissioners approved a resolution extending its moratorium on accepting applications to establish or expand data centers in unincorporated DeKalb County until 30 March 2027, covering zoning, land disturbance, building, business licence and occupancy applications.

Read the sourced record · Primary source

Enacted legislation or regulation

Act 842 revises thresholds and extends exemption

In effect · Georgia · State

Effective: 9 May 2022

Issuing authority: Georgia General Assembly

Georgia Act 842 of 2022 extended the statutory high-technology data center equipment exemption and investment window through 31 December 2031, revised the county-population tiers used for the program's job and expenditure thresholds, and moved the paragraph's repeal to 1 January 2032.

Read the sourced record · Primary source · Archived copy (4 June 2023)

Pending or nonbinding 1 record

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Legislation introduced (any outcome) · DeKalb County (unincorporated) only (local rule)

DeKalb County (unincorporated): proposed health and environmental study before the moratorium can be lifted (2026-0244)

Proposed · Unincorporated DeKalb County, Georgia · Local

Source document: 21 January 2026

Issuing authority: DeKalb County Board of Commissioners

DeKalb County file 2026-0244 is a proposed resolution that would require an independent health and environmental study of data centers, reviewed by the Board of Commissioners, before the county's moratorium can be lifted.

Read the sourced record · Primary source

History 2 records

Expired, repealed, vetoed, failed, blocked, superseded and completed measures remain visible without being presented as current.

Legislation introduced (any outcome) · DeKalb County (unincorporated) only (local rule)

DeKalb County (unincorporated): proposed data center definition and development standards (TA 2025-0972)

Did not pass · Unincorporated DeKalb County, Georgia · Local

Ended: 23 June 2026

Issuing authority: DeKalb County Board of Commissioners

DeKalb County planning staff proposed text amendment 2025-0972 to add a data center definition, regulatory guidelines and development standards to the county zoning code for the industrial and office districts.

Read the sourced record · Primary source

Open the Georgia policy comparison

Review dates: the 7 Georgia records were last checked 22 September 2026 to 3 November 2026. 1 scheduled review is overdue as of the tracker date 3 November 2026: Act 842 revises thresholds and extends exemption (last checked 22 September 2026, review due 22 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.