Facts at a glance
- Record ID
project-sail-coweta-county-ga- Record type
- project
- Evidence confidence
- medium
DataCenterData’s confidence in this record’s sourced fields, not in the project - Developer
- Atlas Development, LLC
- Operator
- Not named in the cited records
- Owner
- William Gause; AKJJ Holdings; Billy & Brenda Harper
- Tenant
- Not named in the cited records
- Capacity
- Unknown No independently supported figure
- Location
- Coweta County, GA
Location precision not recorded — The initial DRI form lists Coweta as the submitting local government and Welcome To Sargent Rd & Wagers Mill as the location, in unincorporated Coweta County. - Physical scale
- Up to nine data center buildings and 4,340,000 square feet on about 829.41 acres, the limit in the April 2026 rezoning conditions. The December 2024 DRI form described 13 buildings of about 378,000 square feet each.
What the sources support
On 7 April 2026 the Coweta County Board of Commissioners voted 3-2 to rezone about 829.41 acres to M (Industrial) for a data center campus, subject to conditions. No document read shows a land disturbance permit, a building permit or construction. Rezoning is not construction.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- critical IT capacity
- utility service capacity
- operator
- tenant
- land disturbance permit
- current construction status on the ground
- the legal form of any relationship to Prologis
- whether any court appeal of the rezoning was filed
Sources
-
Georgia Department of Community Affairs (DCA) →Gov. record
Exact location Submissions table row DRI #4361: Project Sail; Coweta County; unincorporated; development type and process status; no operator column
What it supports Statewide DRI index row for this project only. It does not name an operator.
-
Georgia Department of Community Affairs (DCA) →Gov. record
Exact location Initial DRI Information Form, DRI #4361: Submitting Local Government Coweta; Project Project Sail; Description Data Center consisting of 13 Buildings being +/- 378,000 SF each and substations.; Developer Atlas Development, LLC; Location Welcome To Sargent Rd & Wagers Mill; action requested Rezoning; estimated completion 12/31/2036
What it supports Local-government-filed initial DRI form naming the project, developer and owners and requesting rezoning. Planned building figures are one project description, not operating facilities. The application was amended in January 2026; see the April 2026 minutes.
-
Coweta County Board of Commissioners minutes, 7 April 2026 →Gov. record
Exact location Petition # REZ 24-19 filed by Atlas Development, LLC: staff presentation, applicant remarks, motion to deny, rezoning motion and its conditions
What it supports County rezoning decision and conditions, the January 2026 application amendment, the nine-building and 4,340,000-square-foot limit, and an applicant representative naming Prologis. Not a permit or construction record.
Connected records
Each connection below is a stored, reviewed relationship with its own basis. It does not change this record’s status.
Metro area: Atlanta-Sandy Springs-Roswell, GA
Record history
Record history · 31 December 2024 · DataCenterData review
project-sail-coweta-county-ga → Record
Why The initial DRI filing described Project Sail and requested rezoning; it did not establish an approved or operating facility.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 18 September 2026 · DataCenterData review
project-sail-coweta-county-ga → Publication
Why Added from the opened Georgia DRI filing after operator-null review; Prologis is not named in the cited records.
Evidence No additional evidence link; see the linked record or claim.
Record history · 12 January 2026 · DataCenterData review
project-sail-coweta-county-ga → Record
Why The applicant amended the rezoning application to comply with the county's newly adopted data center ordinance.
Evidence No additional evidence link; see the linked record or claim.
Record history · 7 April 2026 · DataCenterData review
project-sail-coweta-county-ga → Lifecycle status
Field Lifecycle status
Why The Board of Commissioners rejected a motion to deny, then approved the rezoning 3-2 with conditions. The applicant must obtain a land disturbance permit within 18 months or the Board may initiate rezoning.
Evidence No additional evidence link; see the linked record or claim.
Record history · 3 November 2026 · DataCenterData review
project-sail-coweta-county-ga → Review
Field Review
Why Rechecked against county minutes. An applicant representative told the Board that Prologis and Atlas Development were requesting support for Project Sail; the minutes state no legal relationship or operator. The DRI forms could not be re-read because the state site does not permit automated access.
Evidence No additional evidence link; see the linked record or claim.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Reviewed record project-sail-coweta-county-ga
Project.
Location and precision
- Shown above in Facts at a glance.
Roles
- Shown above in Facts at a glance.
Lifecycle
- Recorded status: approved
Area, acreage and buildings
- Shown above in Facts at a glance.
Power capacity
- Capacity — Not yet recorded here.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID project-sail-coweta-county-ga and the page are prefilled. Accepted material corrections appear on Changes.