Reported geography
Source-reported location for Vantage Data Centers NV1.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Vantage Data Centers
- Address and locality
- McCarran · Storey County · Nevada
- Official metro area
- Reno, NV
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 224 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001530
The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.
- Source review · reviewed 2026-10-09: Vantage prints 1121 USA Parkway, Sparks, NV 89437 for its NV1 campus and places it in Storey County. Nevada DEP’s August 20, 2025 preliminary permit review independently names the Vantage NV1 facility in McCarran, Storey County. These sources use different locality labels; the state document does not print the street number. Its proposal to construct and operate is not evidence of operation.
- Vantage NV1 campus page; document date not stated · source retrieved 2026-09-29
- Nevada DEP preliminary permit review — August 20, 2025 · source retrieved 2026-10-09
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- NV Energy
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 137 acres (source-reported; parcel boundary not established)
- Announced investment
- $3 billion
- Community response
- Provider label: supported
- AI-use label (provider)
- confirmed
- Announced
- July 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Nevada GOED partial sales and personal property tax abatements (Vantage Data Centers, Storey County; $254M capital equipment investment) · Nevada · 2024 · $19.274 million (as stated) Open cited source →
Provider notes
Energy. NV Energy transmission via One Nevada (ON Line) 500kV corridor; geothermal and renewable sources available in region
Water. Closed-loop chiller system minimizing water use; campus targets industry-leading low Water Usage Effectiveness (WUE); LEED certification planned
Community. Storey County Manager Austin Osborne is quoted welcoming Vantage to the Tahoe-Reno Industrial Center, consistent with the county's general industrial-friendly posture toward data centers (see also tract-virginia-highlands-storey-county-nv). Vantage also cites an EDAWN workforce-development partnership. No opposition documented. Checked: operator press release only.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced permanent jobs: Row notes state 1,200+ combined construction-and-operations employment and explicitly say no permanent/construction breakdown is disclosed.
What the source record says
Located in Tahoe Reno Industrial Center (TRIC), Storey County, NV — same industrial park as Google, Apple, Microsoft, and Switch (CITADEL tracked separately). Four multi-story buildings, 1M+ sq ft. Designed for AI densities 360W–720W per sq ft. Vantage's eighth North American market. Coordinates are approximate TRIC centroid. Primary press release states more than 1,200 individuals employed 'across the construction and ongoing operations' — combined construction + permanent total; construction vs. permanent breakdown not separately disclosed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-07 · source-reported proposed
Vantage announced $3B NV1 campus in Storey County; first two buildings fully pre-leased at announcement
- 2025-08 · source-reported under construction
Construction underway; first building scheduled to open Q2 2026
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Vantage Data Centers Invests $3 Billion to Deliver AI Campus in Nevada · Vantage Data Centers
- Vantage Data Centers NV1 Campus Announcement — BusinessWire · BusinessWire
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- NV1 and the Nevada Hyperscale Boom: Vantage Data Centers Bets $3B on the AI Future · Data Center Frontier
- Data center plans to invest $254 million and generate $76 million in tax revenue · Nevada Governor's Office of Economic Development
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID vantage-nv1-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001530
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- McCarran, NV · Storey (Approximate location)
Roles
- Operator: Vantage Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: July 2025
Provider-reported announcement date.
- Status history: 2025-07 · source-reported proposed
Status history supplied by the source.
- Status history: 2025-08 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 137 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 224 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: NV Energy
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $3 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: Nevada GOED partial sales and personal property tax abatements (Vantage Data Centers, Storey County; $254M capital equipment investment) · Nevada · 2024 · $19.274 million (as stated)
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.