This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Switch CITADEL Campus.
Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Switch
- Address and locality
- 1 Superloop Circle · McCarran · Storey County · Nevada · 89434
- Official metro area
- Reno, NV
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 250 MW; Planned: 650 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- exact (provider label)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001394
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- NV Energy (grid interconnect)
- Power source
- Solar
- Cooling
- Closed-loop
- Land area
- 2,000 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: supported
- AI-use label (provider)
- mixed use
- Announced
- 2017
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Nevada data-center tax abatements (NRS 360.754) via the Governor's Office of Economic Development — sales/use tax reduced to ~2% and a 75% property-tax abatement for up to 20 years (Switch-specific totals not publicly itemized) · Nevada (GOED) · 2015 Open cited source →
Provider notes
Energy. 100% renewable since January 2016 via dedicated solar — Switch Station 1 & 2 (179 MW) and a 555 MW Nevada solar project (a reported 127 MW behind-the-meter at Citadel); Switch exited NV Energy's standard supply in 2016 ($27M exit fee). The campus is designed for up to 650 MW at about 4.9¢/kWh.
Water. Uses reclaimed water via a ~16-mile pipeline (4,000 acre-feet/year capacity) from the Truckee Meadows Water Reclamation Facility; Switch's water-reuse approach eliminates cooling chemicals. No facility-specific consumption is disclosed (the pipeline serves all Tahoe Reno Industrial Center tenants).
Community. Located in the purpose-built Tahoe Reno Industrial Center. Storey County officials are broadly supportive (abatements 'bring in revenue for the county and the state'), though USA Parkway traffic rose 382% (2013–2022) and in 2025 the county recommended the state revisit its abatement-award process.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2017 · source-reported under construction
- 2019 · source-reported operational
Located in Tahoe Reno Industrial Center (TRIC); expanding toward 650 MW campus
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Switch CITADEL Campus — Switch.com · Switch
- Switch unveils 650 MW campus in Reno, Nevada — Data Center Knowledge · Data Center Knowledge
- Switch TAHOE RENO Now Open — largest, most advanced data-center campus in the world · Switch
- Have data center tax breaks helped Nevada's economy? — The Nevada Independent · The Nevada Independent
- Switch Will Support Reno Data Center Campus with Reclaimed Water — Data Center Frontier · Data Center Frontier
- Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World · PR Newswire (Switch)
- NDEP Class I Air Quality Operating Permit to Construct AP7375-3672 issued to Switch, Ltd. - physical address 1 Superloop Circle, McCarran NV 89434, HA 83 Tracy Segment / Storey County · Nevada Division of Environmental Protection
- PeeringDB facility registry (Nevada) - Switch Tahoe Reno, org Switch, Ltd., 1 Superloop Circle, McCarran 89434 · PeeringDB
- Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World · Switch
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID switch-citadel-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001394
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): mixed use
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 1 Superloop Circle, McCarran, NV 89434 · Storey (Exact location)
Roles
- Operator: Switch
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2017
Provider-reported announcement date.
- Status history: 2017 · source-reported under construction
Status history supplied by the source.
- Status history: 2019 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 2,000 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Operational: 250 MW; Planned: 650 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: NV Energy (grid interconnect)
Utility as named by the provider.
- Power source: Solar
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: Nevada data-center tax abatements (NRS 360.754) via the Governor's Office of Economic Development — sales/use tax reduced to ~2% and a 75% property-tax abatement for up to 20 years (Switch-specific totals not publicly itemized) · Nevada (GOED) · 2015
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.