Licensed lead · not independently verified · dcd-dir-001145

Avondale Campus

source-reported under construction

Prime Data Centers

Avondale · Maricopa County · Arizona

Reported planned 240 MWSource updated 10 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Avondale Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Prime Data Centers
Address and locality
Avondale · Maricopa County · Arizona
Official metro area
Phoenix-Mesa-Chandler, AZ
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 240 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
10 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001145

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Salt River Project (SRP)Utility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
66.5 acres (source-reported; parcel boundary not established)
Announced investment
$3 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
May 2026Provider-reported announcement date.

Provider notes

Water. Operator specifies a closed-loop cooling system with zero process water use during operations. The City of Avondale restricts water-cooled data centers, considering only closed-loop, air-cooled facilities.

Community. Avondale Mayor Mike Pineda is quoted (2026-05-21 release) praising the $3B+ investment and its closed-loop cooling design. No opposition, resident concerns, or hearing record documented in this source. Checked: operator press release only.

What the source record says

5-building, 66.5-acre campus; groundbreaking on first 3 buildings May 2026.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-05 · source-reported under construction

    Groundbreaking on first 3 buildings.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID prime-avondale-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001145

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Avondale, AZ · Maricopa (Approximate location)

Roles

  • Operator: Prime Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: May 2026

    Provider-reported announcement date.

  • Status history: 2026-05 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 66.5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 240 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Salt River Project (SRP)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $3 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →