Licensed lead · not independently verified · dcd-dir-000949

Meta Rosemount Data Center

source-reported under construction

Meta

Rosemount · Dakota County · Minnesota

Reported planned 75 MWSource updated 13 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Rosemount Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
Rosemount · Dakota County · Minnesota
Official metro area
Minneapolis-St. Paul-Bloomington, MN-WI
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 75 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
13 October 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000949

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Xcel EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
280 acres (source-reported; parcel boundary not established)
Announced investment
$800 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
100 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
March 2024Provider-reported announcement date.

Provider notes

Energy. Powered by 100% renewable energy via Xcel Energy; Meta working with partners to add new renewable resources to the grid

Water. A company representative described typical water use for a facility like this as roughly 10 million gallons a year — compared to a car wash, a small apartment building, or a McDonald's. This is an informal comparison quoted in coverage, not a permitted/reported figure, so no reportedMgd value is asserted.

Community. Governor Walz, Dakota County, City of Rosemount, and University of Minnesota all publicly endorsed the project. Meta also buying additional adjacent parcels (via Jimnist LLC) for potential future phases.

What the source record says

Site is 280 acres of UMore Park (former WWII smokeless powder facility, then Univ. of Minnesota agricultural research land) in Rosemount. Meta's 19th US data center. Coordinates approximate for northern UMore Park area. Additional parcels purchased Feb 2025 via Jimnist LLC for potential expansion; no current build plan on those parcels.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-03 · source-reported proposed

    Governor Walz announced Meta's $800M, 715,000 sq ft data center on 280 acres of UMore Park (purchased from University of Minnesota); internal project name 'Project Bigfoot'

    Open cited source →

  2. 2024 · source-reported under construction

    Construction underway; LEED Gold certification and operational status targeted 2026

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-rosemount-mn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Meta on its website (captured 25 September 2026)
Name as listed
Rosemount
Address as published
Rosemount, MN

Lifecycle status is not published for this listing.

Floor area: 715,000 square feet. Scope campus · stated as planned. Floor area as stated for this campus. Not a different building or campus unless the scope says so. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000949

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Rosemount, MN · Dakota (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: March 2024

    Provider-reported announcement date.

  • Status history: 2024-03 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2024 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 280 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 75 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Xcel Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced investment: $800 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 100 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-13

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →