This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Meta Lebanon (Project Domino).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Meta
- Address and locality
- Lebanon · Boone County · Indiana
- Official metro area
- Indianapolis-Carmel-Greenwood, IN
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 5 August 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000941
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power supply description
- Grid (100% renewable matching; 400+ MW new Indiana clean energy projects backed by Meta)
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 1,500 acres (source-reported; parcel boundary not established)
- Announced investment
- $10 billion
- Announced jobs
- 300 permanent · 4,000 construction
- Community response
- Provider label: supported
- AI-use label (provider)
- confirmed
- Announced
- February 2026
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- 35-year data center sales tax exemption (IEDC) · Indiana · 2026 Open cited source →
Provider notes
Energy. Meta backing 400+ MW of new Indiana renewable energy projects; LEED Gold certification targeted for all buildings
Water. Meta pledged 100% water restoration; 200 million gallons/year returned to Upper Wabash River Basin via Arable irrigation partnership with local farmers for 10 years
Community. Meta committed $120M in local infrastructure improvements (roads, transmission, utilities); $1M/year for 20 years to Boone REMC Community Fund for energy cost assistance; partnership with Lebanon city on public works.
What the source record says
LEAP Innovation and Research District, Lebanon IN (Boone County, ~30 mi NW of Indianapolis). 1,500 acres, 4 million sq ft total; 13 buildings. Among Meta's largest single infrastructure investments. Coordinates are approximate LEAP District area north of Lebanon.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-11 · source-reported proposed
Project known locally as Project Domino since November 2024 at LEAP Innovation and Research District, Lebanon IN
- 2026-02 · source-reported under construction
Official groundbreaking February 11, 2026; $10B investment confirmed; 13-building campus (10 data center + logistics, network, admin); 1 GW capacity target; completion targeted late 2027–early 2028
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment · Meta (about.fb.com)
- Details on long-expected Meta data center campus unveiled · Indiana Capital Chronicle
- Meta Makes Lebanon Data Center Announcement Official · City of Lebanon, IN
- Meta announces plans to build 1-gigawatt data center in Indiana as part of AI build-out · Yahoo Finance
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-lebanon-in. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Lebanon
- Address as published
- Lebanon, IN
Lifecycle status is not published for this listing.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
This row describes the same facility or project as Meta — Lebanon. These records refer to Meta's data center campus in Lebanon, Indiana. No engineering value, current operating status, capacity total or certification is transferred between layers. Meta's announcement does not use the licensed row's name Project Domino, so that name is not established here.
The licensed row remains a separate discovery record with its own source-reported values.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000941
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Lebanon, IN · Boone (Approximate location)
Roles
- Operator: Meta
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: February 2026
Provider-reported announcement date.
- Status history: 2024-11 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-02 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,500 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power supply description: Grid (100% renewable matching; 400+ MW new Indiana clean energy projects backed by Meta)
Provider’s own description of the power supply; no separate utility field was supplied.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $10 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 300 permanent · 4,000 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: 35-year data center sales tax exemption (IEDC) · Indiana · 2026
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-05
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.