Licensed lead · not independently verified · dcd-dir-000935

Meta Gallatin Data Center Campus

source-reported operational

Meta

Gallatin · Sumner County · Tennessee

Reported planned 300 MWReported operational 300 MWSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Gallatin Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
Gallatin · Sumner County · Tennessee
Official metro area
Nashville-Davidson--Murfreesboro--Franklin, TN
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 300 MW; Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000935

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
TVAUtility as named by the provider.
Power source
MixedProvider label.
Cooling
AirProvider label.
Land area
900 acres (source-reported; parcel boundary not established)
Announced investment
$1.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
1,100 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2022Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Woolhawk LLC (Meta subsidiary) PILOT via the Gallatin Industrial Development Board — 20-year term plus construction; payments from $1M/yr (building 1) declining to $550K/yr (building 6), through an IDB land-leaseback mechanism · City of Gallatin / Sumner County, TN Open cited source →
  • Tennessee data-center sales/use-tax exemption (statutory; qualified facilities ≥$100M investment and ≥15 jobs at 150% of state avg wage) — Meta eligible; site-specific value not publicly disclosed · State of Tennessee

Provider notes

Energy. Third-party solar arrangement with TVA to match approximately 300 MW consumption; multiple PPAs including solar deals through TVA

Water. Direct air cooling (outside air + fan technology), no conventional AC units; "use 80% less water than a typical data center" (w.media). Goal of being water-positive by 2030. No site-specific MGD figure published.

Community. Construction peaked at an average of ~1,100 skilled-trade workers on site, and the facility supports "over 100 operational jobs" (a floor) — per the Tennessee Municipal League (Nov 2024). Meta has contributed more than $1M to local nonprofits, the county school system, Volunteer State Community College, and the chamber, plus a $250K grant to the Gallatin Shalom Zone; planted 30 acres of native pollinator habitat and partnered with the Tennessee Environmental Council on school pollinator gardens. LEED Gold; 100% renewable-matched. No public opposition found. …

What the source record says

Campus coordinates are city-centroid approximation for Gallatin, TN. Up to 12 data halls planned on 900+ acres per DPR Construction (general contractor). Meta is deploying AI GPU clusters in waterproof tent structures (rapid deployment structures) at this campus to accelerate capacity ahead of permanent building construction.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022 · source-reported proposed

    Meta announces Gallatin campus expansion

  2. 2024-11 · source-reported operational

    Campus officially launched November 2024 with six facilities on 900 acres

  3. 2025-09 · source-reported operational

    Gallatin Municipal Planning Commission grants permission for 135,000 sq ft tent-based GPU cluster facility; Meta building multi-billion-dollar GPU clusters in rapid deployment structures to accelerate AI capacity

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-gallatin-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Independently reviewed match

This exact source identifier is linked to Meta Gallatin Data Center. The licensed row remains a separate discovery record.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000935

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Gallatin, TN · Sumner (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2022

    Provider-reported announcement date.

  • Status history: 2022 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2024-11 · source-reported operational

    Status history supplied by the source.

  • Status history: 2025-09 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 900 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 300 MW; Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: TVA

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 1,100 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Woolhawk LLC (Meta subsidiary) PILOT via the Gallatin Industrial Development Board — 20-year term plus construction; payments from $1M/yr (building 1) declining to $550K/yr (building 6), through an IDB land-leaseback mechanism · City of Gallatin / Sumner County, TN

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Tennessee data-center sales/use-tax exemption (statutory; qualified facilities ≥$100M investment and ≥15 jobs at 150% of state avg wage) — Meta eligible; site-specific value not publicly disclosed · State of Tennessee

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →