Lifecycle label: operating; effective date not establishedStatus evidence: operator-reportedEvidence: Independently source-linkedReuse: Reference only
Facts at a glance
Record ID
meta-gallatin-tn
Record type
campus
Evidence confidence
high DataCenterData’s confidence in this record’s sourced fields, not in the project
Developer
Not named in the cited records
Operator
Meta
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure No primary-source critical IT, utility-service, utility-request, gross-facility or measured-load figure was established. Renewable-generation figures in the sources cover projects beyond this campus and are not campus capacity.
Location
Gallatin, TN County: Sumner County Approximate location — The state announcement places the data center in the Gallatin Industrial Park and identifies Sumner County. No street address, parcel or exact coordinates are published here.
Physical scale
The 2020 state announcement described a 982,000-square-foot facility under construction. This is a dated announced scope, not a current completed-floor-area finding or a building count.
What the sources support
Meta's November 14, 2024 operator post says the Gallatin Data Center was serving traffic. Tennessee's August 12, 2020 economic-development announcement independently establishes the Gallatin site and says construction had begun. Operation is operator-reported, not an independently inspected current-status finding.
Exact location Announcement body, paragraph beginning 'Construction has just begun'; Gallatin Industrial Park and Sumner County paragraphs
What it supports Facebook/Gallatin site identity, construction milestone, industrial-park and county location, and dated 982,000-square-foot announced scope. Regional solar generation is not campus capacity.
Exact location Opening paragraph beginning 'Meta is thrilled'; following paragraph beginning 'When we first announced'
What it supports Current Meta/Gallatin naming and Meta's statement that the data center was serving traffic. This is an operator disclosure, not independent operating verification.
Sourced classifications
Only values a cited source states for this site are shown; every other dimension is unknown. These are not national shares or rankings.
Operating model: Operated for the operator’s own use (runs the operator’s own services) campus scope · operator statement · moderate confidence “Gallatin Data Center is now serving traffic. That means this data center is now part of our global infrastructure that brings our technologies and services to life, making it possible to connect billions of people worldwide.” — Gallatin, We Are Online, Post body, first paragraph, retrieved 24 September 2026 Not established: The word 'hyperscale' is not used; the post does not exclude third-party equipment on site; operating status after November 2024; capacity.
Connected records
Each connection below is a stored, reviewed relationship with its own basis. It does not change this record’s status.
Why Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity.
Evidence No additional evidence link; see the linked record or claim.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Reviewed record meta-gallatin-tn
Campus · Meta. Independently reviewed record. Values are shown with their recorded basis.
Location and precision
Shown above in Facts at a glance.
Roles
Shown above in Facts at a glance.
Lifecycle
Recorded status: operating
Area, acreage and buildings
Shown above in Facts at a glance.
Power capacity
Capacity — Not yet recorded here. Recorded reason: No primary-source critical IT, utility-service, utility-request, gross-facility or measured-load figure was established. Renewable-generation figures in the sources cover projects beyond this campus and are not campus capacity.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
2 statement(s) naming an operator or presence at this site unit, one row per source. A building with several tenants is one facility with several presence rows.
operating Status basis: Meta's November 14, 2024 operator post says the Gallatin Data Center was serving traffic. Tennessee's August 12, 2020 economic-development announcement independently establishes the Gallatin site and says construction had begun. Operation is operator-reported, not an independently inspected current-status finding.
Layers disagree; not reconciled. Each value is what that layer states; DataCenterData does not pick one.
Capacity by kind
Each row is one kind of figure from one source. Utility, generation, design, critical IT and floor-area figures measure different things; they are never summed or totalled.
Kind
Value and evidence
Scope and timing
Date
Source
Provider-reported capacity
Operational: 300 MW; Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider) provider-reported
Quote-bound facts: each shows the value, the source address, the capture hash (first 12 characters; the full SHA-256 is in the page markup) and the capture date. The source's exact wording stays in the capture record and is not republished here; the capture hash binds it.
No quote-bound fact with a hashed capture is recorded for this facility.
Other values by layer
Field
Value
Layer and basis
Date
Source
physical scale
The 2020 state announcement described a 982,000-square-foot facility under construction. This is a dated announced scope, not a current completed-floor-area finding or a building count.
Reviewed (DCD) · reviewed record
Latest source retrieval/capture date date not stated
These citations belong to the linked reviewed records. They do not establish every figure or present-day operating status. Publication and retrieval dates are shown separately; an unstated date remains unknown.
26 fields in the shared profile are not established for this record. Each states why; missing information does not mean zero or absence.
Street address · not recorded for this field in the register
Postal code · not recorded for this field in the register
Map location precision · not recorded for this field in the register
Operator-stated status · not recorded for this field in the register
Status in public records · not recorded for this field in the register
Critical IT capacity (MW) · not recorded for this field in the register
Requested utility capacity (MW) · not recorded for this field in the register
Reported total power (MW) · not recorded for this field in the register
Generation capacity (MW) · not recorded for this field in the register
Company-announced design capacity (MW) · not recorded for this field in the register
Floor area (sq ft) · not recorded for this field in the register
Data hall or IT floor area (sq ft) · not recorded for this field in the register
Cooling redundancy · not recorded for this field in the register
UPS redundancy · not recorded for this field in the register
Backup generator redundancy · not recorded for this field in the register
Tier design rating · not recorded for this field in the register
Opening year or expected opening year · not recorded for this field in the register
Network presence · not recorded for this field in the register
Service · not recorded for this field in the register
Certification or compliance claims · not recorded for this field in the register
Rack density · not recorded for this field in the register
Space or power availability · not recorded for this field in the register
Specifications and facility pages · not recorded for this field in the register
Business contact · not recorded for this field in the register
Public registration · not recorded for this field in the register
Fact supported by a source quotation · not recorded for this field in the register
Jurisdiction and policy actions
Policy actions are matched to this facility by jurisdiction (state, county, municipality or utility), never by the facility's name. A match means the action covers the place, not that it names or affects this facility.
We plan to re-check this facility every 180 days because it has a reviewed record. Next check due . The last-checked date is the newest evidence date among this facility's sources. Dates are measured against the newest input date, , not the day this page was built.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
For each populated field, the origin of the value shown on this page and the terms it carries. Values that are not redistributable may be read and cited here but are not relicensed.
Values marked Compute Atlas are adapted from Compute Atlas by Edward Kubiak under CC BY 4.0: Compute-infrastructure data from Compute Atlas by Edward Kubiak. DataCenterData did not independently verify them.